[DETAILED BUILDING CONSTRUCTION COSTING]
TAKE OFF SHEET
SERIAL NUMBER DETAILS DAYS REMARKS
MUST FILL ALL PROCEEDING WORK SHEETS
1 VOLUMES CM
2 CONTIGENCIES %
3 LABOUR WAGES UGX/DAY
4 LABOUR HOURS DAYS
5 LABOURERS NO
6 ESTABLISHMENT CHARGES UGX/DAY
7 PLANTS UGX/CM
8 RETENTION UGX
9 TOOLS & EQUIPMENT 1 UGX
10 SITE CLEARANCE 1 SM
11 EXCAVATION OF TOP SOIL 2 SM
12 ANTI TERMITE TREATMENT 0.125 SM
13 EXCAVATION AND EARTH WORKS 3 CM
14 RETURN, FILL AND RAM 0.5 CM
15 DISPOSAL OF SURPLUS EXCAVATED MATERIAL 1 CM
16 SETTING 1.5 NO
17 EXCAVATION TO TRENCHES 4 CM
18 EXCAVATION TO ROCKS 2 CM
19 CONCRETE TO RAMP 1 CM
20 FOUNDATION IN TRENCHES 1 CM
21 FOOTING 1 CM
22 REINFORCEMENT BAR TO FOOTING 3 KG
23 PLITH WALLING 10 CM
24 GROUND BEAM 1 CM
25 REINFORCEMENT TO GROUND BEAM 2 KG
26 FORMWORK TO GROUND BEAM 0.25 NO , SM
27 EARTH/MARRUM FILLING 1 CM
28 HARDCORE 2 CM
29 SAND BLINDING 0.125 CM
30 OVER SITE CONCRETE 2 CM
31 REINFORCEMENT BAR TO OVERSITE 2 KG
32 BRC - BS-… A MESH TO OVERSITE 1 SM
33 FORM WORK TO OVERSITE 0.25 NO
34 DPC & DPM 1 ROLLS
35 OTHERS (LUMP SUMS) 1 ….
OPTIONS
SUBSTUCTURE
MOBILIZATION
[DETAILED BUILDING CONSTRUCTION COSTING]
TAKE OFF SHEET
SERIAL NUMBER DETAILS DAYS REMARKS
36 WALLING 8 CM
37 EAVES FILLING 1 CM
38 GABLE FINISH 2 CM
39 RING BEAM 1.5 CM
40 REINFORCEMENT TO RINGBEAM 1.5 KG
41 FORMWORK TO RINGBEAM 0.25 NO ,SM
42 COLUMN 2 CM
43 REINFORCEMENT TO COLUMN 2 CM
44 FORMWORK TO COLUMN 1 NO ,SM
45 SLAB 0 CM
46 MAXPAN TO SLAB 0 CM
47 REINFORCEMENT TO SLAB 0 KG
48 BRC - BS-…A MESH TO SLAB 0 KG
49 FORM WORK TO SLAB 0 NO ,SM
50 OTHERS (LUMP SUMS) 0 ….
51 CEILING FRAME WORKS 1 NO
52 METALLIC LATH CEILING 0.5 SM
53 METALLIC LATH EAVES 0.375 SM
54 WALL PLATE 0.5 NO
55 RAFTERS 4 NO
56 TIE BEAM 1 NO
57 PURLINES 0.625 NO
58 KING POST FOR TRUSS 0.375 NO
59 DIAGONALS (TIES & STRUTS) FOR TRUSS 0.625 NO
60 FASCIA BOARD 0.375 NO
61 BARGE BOARD 0.375 NO
62 RIDGE 0.125 NO
63 VALLEY GUTTER 0 NO
64 ROOF COVERING 1 NO
65 GABLE END APEX COVER 0.125 NO
66 OTHERS (LUMP SUMS) 3 ….
67 ELECTRICAL INSTALLATION 7 ….
68 PLUMB WORKS 7 ….
69 CEILING PLASTER 4 CM
70 WALL PLASTER AND RENDERING 2 CM
71 FLOOR SCREED / FINISH 1 CM
72 DOOR OPENING 1.5 NO
73 WINDOW OPENING 1.5 NO
74 FITTINGS AND FIXTURES 3 ….
75 PAINTING 2 LS
76 DEMOLISION AND DEMOBILIZATION 0 ….
FINISHES
ROOFING
SUPERSTRUCTURE
PROFFESSION:
CONSTRUCTION MANAGER
EMAIL:
kelsvinnal273k@gmail.com
TEL: +256782023535
COPY RIGHT: 2012
EDITED AND PUBLISHED: A. KELVIN O.
AIDED BY SENIOR LECTURERS: A. PLIERS

Weitere ähnliche Inhalte

Andere mochten auch

Sarah_Becker_Official_Resume
Sarah_Becker_Official_ResumeSarah_Becker_Official_Resume
Sarah_Becker_Official_Resume
Sarah Becker
 
Nano-fiber Diameters as Liquid Concentration Sensors
Nano-fiber Diameters as Liquid Concentration SensorsNano-fiber Diameters as Liquid Concentration Sensors
Nano-fiber Diameters as Liquid Concentration Sensors
Radhi Chyad
 

Andere mochten auch (12)

IndianaJS - Building spatially aware web sites for the Web of Things
IndianaJS - Building spatially aware web sites for the Web of ThingsIndianaJS - Building spatially aware web sites for the Web of Things
IndianaJS - Building spatially aware web sites for the Web of Things
 
Nevera Smeg FAB10RR
Nevera Smeg FAB10RRNevera Smeg FAB10RR
Nevera Smeg FAB10RR
 
Sarah_Becker_Official_Resume
Sarah_Becker_Official_ResumeSarah_Becker_Official_Resume
Sarah_Becker_Official_Resume
 
Historia de la informatica
Historia de la informaticaHistoria de la informatica
Historia de la informatica
 
Photographs
Photographs Photographs
Photographs
 
Rubrica pid
Rubrica pidRubrica pid
Rubrica pid
 
Media research
Media researchMedia research
Media research
 
Gestion des relations avec les autorités de santé - Problématiques, leviers d...
Gestion des relations avec les autorités de santé - Problématiques, leviers d...Gestion des relations avec les autorités de santé - Problématiques, leviers d...
Gestion des relations avec les autorités de santé - Problématiques, leviers d...
 
Nano-fiber Diameters as Liquid Concentration Sensors
Nano-fiber Diameters as Liquid Concentration SensorsNano-fiber Diameters as Liquid Concentration Sensors
Nano-fiber Diameters as Liquid Concentration Sensors
 
3 d2n
3 d2n3 d2n
3 d2n
 
Rubrica competencia siglo 21
Rubrica competencia siglo 21Rubrica competencia siglo 21
Rubrica competencia siglo 21
 
04_NS_Escritura_web
04_NS_Escritura_web04_NS_Escritura_web
04_NS_Escritura_web
 

Ähnlich wie EXCEL COST ESTIMATOR (1) (8)

MMG Steel Factories Brochure (DSF & RSF)
MMG Steel Factories Brochure (DSF & RSF)MMG Steel Factories Brochure (DSF & RSF)
MMG Steel Factories Brochure (DSF & RSF)
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewer
 
Guidelines for r.c.c. based topics by Dhruv Girish Karpe
Guidelines for r.c.c. based topics by Dhruv Girish KarpeGuidelines for r.c.c. based topics by Dhruv Girish Karpe
Guidelines for r.c.c. based topics by Dhruv Girish Karpe
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
Pillar design
Pillar designPillar design
Pillar design
 
Pillar design
Pillar designPillar design
Pillar design
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 

EXCEL COST ESTIMATOR (1)

  • 1. [DETAILED BUILDING CONSTRUCTION COSTING] TAKE OFF SHEET SERIAL NUMBER DETAILS DAYS REMARKS MUST FILL ALL PROCEEDING WORK SHEETS 1 VOLUMES CM 2 CONTIGENCIES % 3 LABOUR WAGES UGX/DAY 4 LABOUR HOURS DAYS 5 LABOURERS NO 6 ESTABLISHMENT CHARGES UGX/DAY 7 PLANTS UGX/CM 8 RETENTION UGX 9 TOOLS & EQUIPMENT 1 UGX 10 SITE CLEARANCE 1 SM 11 EXCAVATION OF TOP SOIL 2 SM 12 ANTI TERMITE TREATMENT 0.125 SM 13 EXCAVATION AND EARTH WORKS 3 CM 14 RETURN, FILL AND RAM 0.5 CM 15 DISPOSAL OF SURPLUS EXCAVATED MATERIAL 1 CM 16 SETTING 1.5 NO 17 EXCAVATION TO TRENCHES 4 CM 18 EXCAVATION TO ROCKS 2 CM 19 CONCRETE TO RAMP 1 CM 20 FOUNDATION IN TRENCHES 1 CM 21 FOOTING 1 CM 22 REINFORCEMENT BAR TO FOOTING 3 KG 23 PLITH WALLING 10 CM 24 GROUND BEAM 1 CM 25 REINFORCEMENT TO GROUND BEAM 2 KG 26 FORMWORK TO GROUND BEAM 0.25 NO , SM 27 EARTH/MARRUM FILLING 1 CM 28 HARDCORE 2 CM 29 SAND BLINDING 0.125 CM 30 OVER SITE CONCRETE 2 CM 31 REINFORCEMENT BAR TO OVERSITE 2 KG 32 BRC - BS-… A MESH TO OVERSITE 1 SM 33 FORM WORK TO OVERSITE 0.25 NO 34 DPC & DPM 1 ROLLS 35 OTHERS (LUMP SUMS) 1 …. OPTIONS SUBSTUCTURE MOBILIZATION
  • 2. [DETAILED BUILDING CONSTRUCTION COSTING] TAKE OFF SHEET SERIAL NUMBER DETAILS DAYS REMARKS 36 WALLING 8 CM 37 EAVES FILLING 1 CM 38 GABLE FINISH 2 CM 39 RING BEAM 1.5 CM 40 REINFORCEMENT TO RINGBEAM 1.5 KG 41 FORMWORK TO RINGBEAM 0.25 NO ,SM 42 COLUMN 2 CM 43 REINFORCEMENT TO COLUMN 2 CM 44 FORMWORK TO COLUMN 1 NO ,SM 45 SLAB 0 CM 46 MAXPAN TO SLAB 0 CM 47 REINFORCEMENT TO SLAB 0 KG 48 BRC - BS-…A MESH TO SLAB 0 KG 49 FORM WORK TO SLAB 0 NO ,SM 50 OTHERS (LUMP SUMS) 0 …. 51 CEILING FRAME WORKS 1 NO 52 METALLIC LATH CEILING 0.5 SM 53 METALLIC LATH EAVES 0.375 SM 54 WALL PLATE 0.5 NO 55 RAFTERS 4 NO 56 TIE BEAM 1 NO 57 PURLINES 0.625 NO 58 KING POST FOR TRUSS 0.375 NO 59 DIAGONALS (TIES & STRUTS) FOR TRUSS 0.625 NO 60 FASCIA BOARD 0.375 NO 61 BARGE BOARD 0.375 NO 62 RIDGE 0.125 NO 63 VALLEY GUTTER 0 NO 64 ROOF COVERING 1 NO 65 GABLE END APEX COVER 0.125 NO 66 OTHERS (LUMP SUMS) 3 …. 67 ELECTRICAL INSTALLATION 7 …. 68 PLUMB WORKS 7 …. 69 CEILING PLASTER 4 CM 70 WALL PLASTER AND RENDERING 2 CM 71 FLOOR SCREED / FINISH 1 CM 72 DOOR OPENING 1.5 NO 73 WINDOW OPENING 1.5 NO 74 FITTINGS AND FIXTURES 3 …. 75 PAINTING 2 LS 76 DEMOLISION AND DEMOBILIZATION 0 …. FINISHES ROOFING SUPERSTRUCTURE
  • 3. PROFFESSION: CONSTRUCTION MANAGER EMAIL: kelsvinnal273k@gmail.com TEL: +256782023535 COPY RIGHT: 2012 EDITED AND PUBLISHED: A. KELVIN O. AIDED BY SENIOR LECTURERS: A. PLIERS