1. [DETAILED BUILDING CONSTRUCTION COSTING]
TAKE OFF SHEET
SERIAL NUMBER DETAILS DAYS REMARKS
MUST FILL ALL PROCEEDING WORK SHEETS
1 VOLUMES CM
2 CONTIGENCIES %
3 LABOUR WAGES UGX/DAY
4 LABOUR HOURS DAYS
5 LABOURERS NO
6 ESTABLISHMENT CHARGES UGX/DAY
7 PLANTS UGX/CM
8 RETENTION UGX
9 TOOLS & EQUIPMENT 1 UGX
10 SITE CLEARANCE 1 SM
11 EXCAVATION OF TOP SOIL 2 SM
12 ANTI TERMITE TREATMENT 0.125 SM
13 EXCAVATION AND EARTH WORKS 3 CM
14 RETURN, FILL AND RAM 0.5 CM
15 DISPOSAL OF SURPLUS EXCAVATED MATERIAL 1 CM
16 SETTING 1.5 NO
17 EXCAVATION TO TRENCHES 4 CM
18 EXCAVATION TO ROCKS 2 CM
19 CONCRETE TO RAMP 1 CM
20 FOUNDATION IN TRENCHES 1 CM
21 FOOTING 1 CM
22 REINFORCEMENT BAR TO FOOTING 3 KG
23 PLITH WALLING 10 CM
24 GROUND BEAM 1 CM
25 REINFORCEMENT TO GROUND BEAM 2 KG
26 FORMWORK TO GROUND BEAM 0.25 NO , SM
27 EARTH/MARRUM FILLING 1 CM
28 HARDCORE 2 CM
29 SAND BLINDING 0.125 CM
30 OVER SITE CONCRETE 2 CM
31 REINFORCEMENT BAR TO OVERSITE 2 KG
32 BRC - BS-… A MESH TO OVERSITE 1 SM
33 FORM WORK TO OVERSITE 0.25 NO
34 DPC & DPM 1 ROLLS
35 OTHERS (LUMP SUMS) 1 ….
OPTIONS
SUBSTUCTURE
MOBILIZATION
2. [DETAILED BUILDING CONSTRUCTION COSTING]
TAKE OFF SHEET
SERIAL NUMBER DETAILS DAYS REMARKS
36 WALLING 8 CM
37 EAVES FILLING 1 CM
38 GABLE FINISH 2 CM
39 RING BEAM 1.5 CM
40 REINFORCEMENT TO RINGBEAM 1.5 KG
41 FORMWORK TO RINGBEAM 0.25 NO ,SM
42 COLUMN 2 CM
43 REINFORCEMENT TO COLUMN 2 CM
44 FORMWORK TO COLUMN 1 NO ,SM
45 SLAB 0 CM
46 MAXPAN TO SLAB 0 CM
47 REINFORCEMENT TO SLAB 0 KG
48 BRC - BS-…A MESH TO SLAB 0 KG
49 FORM WORK TO SLAB 0 NO ,SM
50 OTHERS (LUMP SUMS) 0 ….
51 CEILING FRAME WORKS 1 NO
52 METALLIC LATH CEILING 0.5 SM
53 METALLIC LATH EAVES 0.375 SM
54 WALL PLATE 0.5 NO
55 RAFTERS 4 NO
56 TIE BEAM 1 NO
57 PURLINES 0.625 NO
58 KING POST FOR TRUSS 0.375 NO
59 DIAGONALS (TIES & STRUTS) FOR TRUSS 0.625 NO
60 FASCIA BOARD 0.375 NO
61 BARGE BOARD 0.375 NO
62 RIDGE 0.125 NO
63 VALLEY GUTTER 0 NO
64 ROOF COVERING 1 NO
65 GABLE END APEX COVER 0.125 NO
66 OTHERS (LUMP SUMS) 3 ….
67 ELECTRICAL INSTALLATION 7 ….
68 PLUMB WORKS 7 ….
69 CEILING PLASTER 4 CM
70 WALL PLASTER AND RENDERING 2 CM
71 FLOOR SCREED / FINISH 1 CM
72 DOOR OPENING 1.5 NO
73 WINDOW OPENING 1.5 NO
74 FITTINGS AND FIXTURES 3 ….
75 PAINTING 2 LS
76 DEMOLISION AND DEMOBILIZATION 0 ….
FINISHES
ROOFING
SUPERSTRUCTURE