Ichthys LNG Project
Ichthys
Project
Our partners
The lchthys LNG Project is a joint venture
between Operator INPEX, major partner
TOTAL and the Australian subsidiaries of
Tokyo Gas, Osaka Gas, Chubu Electric Power
and Toho Gas.
This world-class project has captured the
imagination of the oil and gas industry and the
Ichthys team has attracted professionals from
all over the globe to work in Project locations
from Perth to Geoje, Yokohama, Batam,
Darwin, Singapore and Aberdeen.
Drawing on vast industry experience, joint
venture partnerships, a financially secure
Project, strong values and the confidence that
we can meet the challenges ahead – INPEX
Australia has assembled a world-class team to
deliver the Ichthys LNG Project.
Timeline
›› 1998: Acquisition of exploration permit
WA-285-P by INPEX CORPORATION.
›› 2000-2001: INPEX drills three exploratory
wells in WA-285-P, confirming the Ichthys
Field has promising resources of natural gas
and condensate.
›› 2006: Long-standing business partner and
oil and gas super major TOTAL acquires a 26
per cent participating interest in the Project.
›› 2008: Darwin is announced as the preferred
onshore location for the lchthys LNG Project
onshore processing facilities.
›› 2011: The Project’s Environmental Impact
Statement is approved.
›› 2012: A Final Investment Decision gives the
green light for the US$34 billion Project,
followed by the securing of US$20 billion in
project financing – the biggest ever arranged
on the international financial markets.
›› 2013: Work commences on fabrication of
all major onshore and offshore facilities and
889 kilometres of pipe is manufactured.
Manigurr-ma village opens near Darwin, to
accommodate up to 3,500 workers during
peak construction.
›› 2016: First production is scheduled to start
by late 2016 with an expected operational
life of at least 40 years.
Working the field
To extract gas and condensate
from the lchthys Field, wells will
be drilled in the Browse Basin.
Subsea production systems,
which sit on top of the wells and
control the flow of hydrocarbons,
will connect to a series of
umbilicals, risers and flowlines –
taking gas and condensate to a
floating, semi-submersible central
processing facility nearby.
Offshore processing
Natural gas and condensate
from the Field’s subsea wells
will undergo initial processing
on the large, floating central
processing facility (CPF), which
will be permanently moored near
the Field. The CPF will extract
condensate and water and
remove impurities at the earliest
opportunity to make the gas and
some condensate suitable for
transmission through the gas
export pipeline.
Most condensate will be
transferred from the CPF to
the nearby floating production,
storage and offloading facility
(FPSO) for offshore processing.
Condensate export
The floating production, storage
and offloading facility (FPSO) will
be moored about 3.5 kilometres
from the CPF. It will process and
store condensate from the CPF
and periodically offload stabilised
condensate to shuttle carriers for
export directly to market.
The FPSO is designed to hold
more than one million barrels
of condensate and – like the
CPF – has the capacity to
accommodate a workforce
of about 150.
Connecting the field
to Darwin
A gas export pipeline (GEP) will
deliver gas and some condensate
from the CPF to the onshore
processing facilities at Bladin
Point near Darwin so that it
can be prepared for export.
At 889 kilometres, the lchthys
LNG Project GEP will be one
of the longest subsea pipelines
ever built.
Onshore processing
The onshore processing facilities
near Darwin will cool gas from
the pipeline and transform it into
liquid to reduce its volume for
transport. Onshore facilities will
include: two LNG trains, LPG
and condensate plants, product
storage tanks, administration
facilities, utilities and a jetty.
A peak workforce of more than
4,000 is needed to complete
the onshore facilities at Bladin
Point, which are currently under
construction. The majority of
the temporary construction
fly-in-fly-out workforce will live
in the purpose-built Manigurr-ma
Village near Darwin that was
opened in 2013.
LNG and LPG transport
The lchthys LNG Project will
require three LNG carriers
and one LPG carrier to export
product from Darwin Harbour
each week as well as one or two
condensate carriers each month.
The LNG carriers are heavily
insulated to keep gas liquefied
as it is transported to market.
Overview
Effectively three mega-
projects rolled into one, the
lchthys LNG Project involves
some of the industry’s largest
and most advanced offshore
facilities, significant onshore
infrastructure and an 889
kilometre pipeline to unite
them. The Project has an
expected operational life of
at least 40 years.
The Ichthys LNG Project
As Australia moves to take its place as one of the world’s biggest
LNG exporters by 2020, the INPEX-operated Ichthys LNG Project
stands as one of the country’s most exciting and challenging
developments.
The Ichthys Field was the largest discovery of hydrocarbon liquids
in Australia in 40 years and the Ichthys LNG Project ranks among
the largest and most significant energy projects in the world.
The Project includes some of the world’s biggest and most
advanced offshore facilities, massive onshore processing facilities
near Darwin in the Northern Territory and an 889 kilometre
pipeline to unite them. Each of these three components is a
mega-project in its own right and construction is progressing
strongly, with first production scheduled for the end of 2016.
When operational, the Ichthys LNG Project is expected to
produce 8.4 million tonnes of LNG and 1.6 million tonnes of
LPG per annum, along with approximately 100,000 barrels of
condensate per day at peak.
Strategically partnering with leading companies and contractors
in the oil and gas industry, the Project has attracted the world’s
best, uniting them with the singular vision of bringing one of
Australia’s largest resources projects to life.
With the security of having delivered the biggest project financing
ever arranged in the international markets and with sales and
purchase agreements already in place, the volume and value of
Ichthys LNG Project reserves will supply customers with energy
for more than 40 years.
In Australia, the Project is already delivering considerable benefits,
including new business opportunities, major new and improved
infrastructure and expanded economic, employment and training
outcomes that will continue for generations.
Browse Basin Ichthys
Darwin
The Browse Basin
Covering 140,000 square kilometres, the
Browse Basin is one of the world’s most
exciting and prospective exploration areas, and
contains some of Australia’s largest gas fields.
Located about 220 kilometres offshore
Western Australia and 820 kilometres south-
west of Darwin, the Ichthys Field covers an
area of around 800 square kilometres in water
averaging depths of around 250 metres.
The Ichthys Field is estimated to contain more
than 12 trillion cubic feet of gas and 500 million
barrels of condensate.
Our people
With an expected operational life of at least
40 years, the lchthys LNG Project offers rare,
multi-generational opportunities to communities,
economies, businesses, energy markets and its
own workforce.
The Project has attracted people who have the will
power to make things happen. They value courage,
determination, integrity, diversity, mutual respect,
collaboration and ingenuity.
More than 4,000 people are needed for peak
construction on the LNG facilities near Darwin and
thousands more are currently working in fabrication
roles. A growing operations team is actively preparing
for start-up and searching for the right people to
join the Project for onshore and offshore post-
construction roles.
As the operator of the Ichthys LNG Project, INPEX is
committed to contributing to the development of
host countries and communities wherever it
Ichthys
Project
INPEX Australia
Level 22, 100 St Georges Terrace
Perth, Western Australia 6000
T: +61 8 6213 6000
F: +61 8 6213 6455
E: enquiries@inpex.com.au
W: INPEX.com.au
operates. INPEX believes in providing benefits
to these communities and contributing to their
sustainable social, economic and environmental
development.
Identifying and providing opportunities for local
businesses and local people, including Aboriginal
and Torres Strait Islander peoples is part of this
commitment.
INPEX has also committed to full, fair and reasonable
opportunity for Australian industry to take part in
the Project and is committed to getting it right
by building effective partnerships through active
engagement and consultation.
INPEX promotes a safe and harmonious
workplace culture in Australia. 安全第一
Anzen Dai Ichi – Safety Number One is a goal, key
behaviour, and commitment linked to INPEX’s health,
safety and environmental values.
The Ichthys LNG Project is a Joint Venture between INPEX group companies (the Operator), major partner
TOTAL and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas.

More Related Content

What's hot

Oil Spill Controls Perspective from Hydrocarbon Industries
Oil Spill Controls Perspective from Hydrocarbon IndustriesOil Spill Controls Perspective from Hydrocarbon Industries
Oil Spill Controls Perspective from Hydrocarbon Industriescmmindia2017
 
New base energy news october 15 2018 no-1206 by khaled al awadi
New base energy news october 15   2018 no-1206  by khaled al awadiNew base energy news october 15   2018 no-1206  by khaled al awadi
New base energy news october 15 2018 no-1206 by khaled al awadiKhaled Al Awadi
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickThorne & Derrick International
 
New base special 23 june 2014
New base special  23  june 2014New base special  23  june 2014
New base special 23 june 2014Khaled Al Awadi
 
SATH blows in change for Floating Offshore Wind
SATH blows in change for Floating Offshore WindSATH blows in change for Floating Offshore Wind
SATH blows in change for Floating Offshore WindDavid Carrascosa Francis
 
New base 05 june 2018 energy news issue - 1177 by khaled al awadi
New base 05 june 2018 energy news issue - 1177  by khaled al awadi New base 05 june 2018 energy news issue - 1177  by khaled al awadi
New base 05 june 2018 energy news issue - 1177 by khaled al awadi Khaled Al Awadi
 
New base energy news 06 may 2019 issue no 1243 by khaled al awadi
New base energy news 06 may 2019 issue no 1243  by khaled al awadiNew base energy news 06 may 2019 issue no 1243  by khaled al awadi
New base energy news 06 may 2019 issue no 1243 by khaled al awadiKhaled Al Awadi
 
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...oilandgas
 
Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016Business Finland
 
Ons 2012 peregrino ior (rev2)
Ons 2012   peregrino ior (rev2)Ons 2012   peregrino ior (rev2)
Ons 2012 peregrino ior (rev2)Statoil
 
Heroes at the frontier of Energy Marine 2016
Heroes at the frontier of Energy  Marine 2016Heroes at the frontier of Energy  Marine 2016
Heroes at the frontier of Energy Marine 2016Hayley Boyd- Hawkins
 
Heroes at the frontier of Energy & Marine 2016
Heroes at the frontier of Energy & Marine 2016Heroes at the frontier of Energy & Marine 2016
Heroes at the frontier of Energy & Marine 2016Juris Capass
 
Investment opportunities in Trinidad's maritime industry
Investment opportunities in Trinidad's maritime industryInvestment opportunities in Trinidad's maritime industry
Investment opportunities in Trinidad's maritime industryinvesTT Trinidad and Tobago
 
Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Firdaus Salim
 
New base energy news issue 920 dated 01 september 2016
New base energy news issue  920 dated 01 september 2016New base energy news issue  920 dated 01 september 2016
New base energy news issue 920 dated 01 september 2016Khaled Al Awadi
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Atkins
 
Glasgow elevator pitches
Glasgow elevator pitchesGlasgow elevator pitches
Glasgow elevator pitchesKTN
 
African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016Business Finland
 
Final technology brochure
Final technology brochureFinal technology brochure
Final technology brochuredamianirch
 

What's hot (20)

Oil Spill Controls Perspective from Hydrocarbon Industries
Oil Spill Controls Perspective from Hydrocarbon IndustriesOil Spill Controls Perspective from Hydrocarbon Industries
Oil Spill Controls Perspective from Hydrocarbon Industries
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
New base energy news october 15 2018 no-1206 by khaled al awadi
New base energy news october 15   2018 no-1206  by khaled al awadiNew base energy news october 15   2018 no-1206  by khaled al awadi
New base energy news october 15 2018 no-1206 by khaled al awadi
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
 
New base special 23 june 2014
New base special  23  june 2014New base special  23  june 2014
New base special 23 june 2014
 
SATH blows in change for Floating Offshore Wind
SATH blows in change for Floating Offshore WindSATH blows in change for Floating Offshore Wind
SATH blows in change for Floating Offshore Wind
 
New base 05 june 2018 energy news issue - 1177 by khaled al awadi
New base 05 june 2018 energy news issue - 1177  by khaled al awadi New base 05 june 2018 energy news issue - 1177  by khaled al awadi
New base 05 june 2018 energy news issue - 1177 by khaled al awadi
 
New base energy news 06 may 2019 issue no 1243 by khaled al awadi
New base energy news 06 may 2019 issue no 1243  by khaled al awadiNew base energy news 06 may 2019 issue no 1243  by khaled al awadi
New base energy news 06 may 2019 issue no 1243 by khaled al awadi
 
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
Sami f al rushaid's presentation slides from the 2010 World National Oil Comp...
 
Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016
 
Ons 2012 peregrino ior (rev2)
Ons 2012   peregrino ior (rev2)Ons 2012   peregrino ior (rev2)
Ons 2012 peregrino ior (rev2)
 
Heroes at the frontier of Energy Marine 2016
Heroes at the frontier of Energy  Marine 2016Heroes at the frontier of Energy  Marine 2016
Heroes at the frontier of Energy Marine 2016
 
Heroes at the frontier of Energy & Marine 2016
Heroes at the frontier of Energy & Marine 2016Heroes at the frontier of Energy & Marine 2016
Heroes at the frontier of Energy & Marine 2016
 
Investment opportunities in Trinidad's maritime industry
Investment opportunities in Trinidad's maritime industryInvestment opportunities in Trinidad's maritime industry
Investment opportunities in Trinidad's maritime industry
 
Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)
 
New base energy news issue 920 dated 01 september 2016
New base energy news issue  920 dated 01 september 2016New base energy news issue  920 dated 01 september 2016
New base energy news issue 920 dated 01 september 2016
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
Glasgow elevator pitches
Glasgow elevator pitchesGlasgow elevator pitches
Glasgow elevator pitches
 
African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016African market_Maritime business seminar on 24.11.2016
African market_Maritime business seminar on 24.11.2016
 
Final technology brochure
Final technology brochureFinal technology brochure
Final technology brochure
 

Similar to INPEX-Operated Ichthys LNG Project

focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globeKlaus Gohra
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALRichard Exley
 
Terra et Aqua 143 (journal - dredging related articles)
Terra et Aqua 143 (journal - dredging related articles)Terra et Aqua 143 (journal - dredging related articles)
Terra et Aqua 143 (journal - dredging related articles)Renato Rauwerda
 
Chevron frontier-issue-12
Chevron frontier-issue-12Chevron frontier-issue-12
Chevron frontier-issue-12Erin Picken
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewDevan Gopal
 
Major contract Air Liquide selected to build, own and operate the world’s lar...
Major contract Air Liquide selected to build, own and operate the world’s lar...Major contract Air Liquide selected to build, own and operate the world’s lar...
Major contract Air Liquide selected to build, own and operate the world’s lar...Craig Carter
 
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois AasiassaOffshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois AasiassaBusiness Finland
 
Port of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionPort of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionMarketing Durban Chamber
 
Qatargas me-oil gas-july13-bro-s
Qatargas me-oil gas-july13-bro-sQatargas me-oil gas-july13-bro-s
Qatargas me-oil gas-july13-bro-sAbi Abagun
 
ORA_6_2015_Final 34
ORA_6_2015_Final 34ORA_6_2015_Final 34
ORA_6_2015_Final 34James Rowley
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USGlobal CCS Institute
 
Dragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeDragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeOscar Del Santo
 
Environment Project Managment
Environment Project Managment Environment Project Managment
Environment Project Managment Syeda Maheen Ali
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentationEUROHULL LTD
 

Similar to INPEX-Operated Ichthys LNG Project (20)

focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globe
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
Australia
Australia Australia
Australia
 
Terra et Aqua 143 (journal - dredging related articles)
Terra et Aqua 143 (journal - dredging related articles)Terra et Aqua 143 (journal - dredging related articles)
Terra et Aqua 143 (journal - dredging related articles)
 
Chevron frontier-issue-12
Chevron frontier-issue-12Chevron frontier-issue-12
Chevron frontier-issue-12
 
Clough Booth Welsh Brochure
Clough Booth Welsh BrochureClough Booth Welsh Brochure
Clough Booth Welsh Brochure
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overview
 
Major contract Air Liquide selected to build, own and operate the world’s lar...
Major contract Air Liquide selected to build, own and operate the world’s lar...Major contract Air Liquide selected to build, own and operate the world’s lar...
Major contract Air Liquide selected to build, own and operate the world’s lar...
 
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois AasiassaOffshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
Port of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 EditionPort of Durban Monitor eNewsletter - September 2016 Edition
Port of Durban Monitor eNewsletter - September 2016 Edition
 
201507 caisson repair project final
201507 caisson repair project final201507 caisson repair project final
201507 caisson repair project final
 
qatar_november_2011_web
qatar_november_2011_webqatar_november_2011_web
qatar_november_2011_web
 
Qatargas me-oil gas-july13-bro-s
Qatargas me-oil gas-july13-bro-sQatargas me-oil gas-july13-bro-s
Qatargas me-oil gas-july13-bro-s
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
ORA_6_2015_Final 34
ORA_6_2015_Final 34ORA_6_2015_Final 34
ORA_6_2015_Final 34
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The US
 
Dragados Offshore - Industry Europe
Dragados Offshore - Industry EuropeDragados Offshore - Industry Europe
Dragados Offshore - Industry Europe
 
Environment Project Managment
Environment Project Managment Environment Project Managment
Environment Project Managment
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentation
 

INPEX-Operated Ichthys LNG Project

  • 2. Our partners The lchthys LNG Project is a joint venture between Operator INPEX, major partner TOTAL and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas. This world-class project has captured the imagination of the oil and gas industry and the Ichthys team has attracted professionals from all over the globe to work in Project locations from Perth to Geoje, Yokohama, Batam, Darwin, Singapore and Aberdeen. Drawing on vast industry experience, joint venture partnerships, a financially secure Project, strong values and the confidence that we can meet the challenges ahead – INPEX Australia has assembled a world-class team to deliver the Ichthys LNG Project. Timeline ›› 1998: Acquisition of exploration permit WA-285-P by INPEX CORPORATION. ›› 2000-2001: INPEX drills three exploratory wells in WA-285-P, confirming the Ichthys Field has promising resources of natural gas and condensate. ›› 2006: Long-standing business partner and oil and gas super major TOTAL acquires a 26 per cent participating interest in the Project. ›› 2008: Darwin is announced as the preferred onshore location for the lchthys LNG Project onshore processing facilities. ›› 2011: The Project’s Environmental Impact Statement is approved. ›› 2012: A Final Investment Decision gives the green light for the US$34 billion Project, followed by the securing of US$20 billion in project financing – the biggest ever arranged on the international financial markets. ›› 2013: Work commences on fabrication of all major onshore and offshore facilities and 889 kilometres of pipe is manufactured. Manigurr-ma village opens near Darwin, to accommodate up to 3,500 workers during peak construction. ›› 2016: First production is scheduled to start by late 2016 with an expected operational life of at least 40 years.
  • 3. Working the field To extract gas and condensate from the lchthys Field, wells will be drilled in the Browse Basin. Subsea production systems, which sit on top of the wells and control the flow of hydrocarbons, will connect to a series of umbilicals, risers and flowlines – taking gas and condensate to a floating, semi-submersible central processing facility nearby. Offshore processing Natural gas and condensate from the Field’s subsea wells will undergo initial processing on the large, floating central processing facility (CPF), which will be permanently moored near the Field. The CPF will extract condensate and water and remove impurities at the earliest opportunity to make the gas and some condensate suitable for transmission through the gas export pipeline. Most condensate will be transferred from the CPF to the nearby floating production, storage and offloading facility (FPSO) for offshore processing. Condensate export The floating production, storage and offloading facility (FPSO) will be moored about 3.5 kilometres from the CPF. It will process and store condensate from the CPF and periodically offload stabilised condensate to shuttle carriers for export directly to market. The FPSO is designed to hold more than one million barrels of condensate and – like the CPF – has the capacity to accommodate a workforce of about 150. Connecting the field to Darwin A gas export pipeline (GEP) will deliver gas and some condensate from the CPF to the onshore processing facilities at Bladin Point near Darwin so that it can be prepared for export. At 889 kilometres, the lchthys LNG Project GEP will be one of the longest subsea pipelines ever built. Onshore processing The onshore processing facilities near Darwin will cool gas from the pipeline and transform it into liquid to reduce its volume for transport. Onshore facilities will include: two LNG trains, LPG and condensate plants, product storage tanks, administration facilities, utilities and a jetty. A peak workforce of more than 4,000 is needed to complete the onshore facilities at Bladin Point, which are currently under construction. The majority of the temporary construction fly-in-fly-out workforce will live in the purpose-built Manigurr-ma Village near Darwin that was opened in 2013. LNG and LPG transport The lchthys LNG Project will require three LNG carriers and one LPG carrier to export product from Darwin Harbour each week as well as one or two condensate carriers each month. The LNG carriers are heavily insulated to keep gas liquefied as it is transported to market. Overview Effectively three mega- projects rolled into one, the lchthys LNG Project involves some of the industry’s largest and most advanced offshore facilities, significant onshore infrastructure and an 889 kilometre pipeline to unite them. The Project has an expected operational life of at least 40 years. The Ichthys LNG Project As Australia moves to take its place as one of the world’s biggest LNG exporters by 2020, the INPEX-operated Ichthys LNG Project stands as one of the country’s most exciting and challenging developments. The Ichthys Field was the largest discovery of hydrocarbon liquids in Australia in 40 years and the Ichthys LNG Project ranks among the largest and most significant energy projects in the world. The Project includes some of the world’s biggest and most advanced offshore facilities, massive onshore processing facilities near Darwin in the Northern Territory and an 889 kilometre pipeline to unite them. Each of these three components is a mega-project in its own right and construction is progressing strongly, with first production scheduled for the end of 2016. When operational, the Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak. Strategically partnering with leading companies and contractors in the oil and gas industry, the Project has attracted the world’s best, uniting them with the singular vision of bringing one of Australia’s largest resources projects to life. With the security of having delivered the biggest project financing ever arranged in the international markets and with sales and purchase agreements already in place, the volume and value of Ichthys LNG Project reserves will supply customers with energy for more than 40 years. In Australia, the Project is already delivering considerable benefits, including new business opportunities, major new and improved infrastructure and expanded economic, employment and training outcomes that will continue for generations. Browse Basin Ichthys Darwin The Browse Basin Covering 140,000 square kilometres, the Browse Basin is one of the world’s most exciting and prospective exploration areas, and contains some of Australia’s largest gas fields. Located about 220 kilometres offshore Western Australia and 820 kilometres south- west of Darwin, the Ichthys Field covers an area of around 800 square kilometres in water averaging depths of around 250 metres. The Ichthys Field is estimated to contain more than 12 trillion cubic feet of gas and 500 million barrels of condensate.
  • 4. Our people With an expected operational life of at least 40 years, the lchthys LNG Project offers rare, multi-generational opportunities to communities, economies, businesses, energy markets and its own workforce. The Project has attracted people who have the will power to make things happen. They value courage, determination, integrity, diversity, mutual respect, collaboration and ingenuity. More than 4,000 people are needed for peak construction on the LNG facilities near Darwin and thousands more are currently working in fabrication roles. A growing operations team is actively preparing for start-up and searching for the right people to join the Project for onshore and offshore post- construction roles. As the operator of the Ichthys LNG Project, INPEX is committed to contributing to the development of host countries and communities wherever it Ichthys Project INPEX Australia Level 22, 100 St Georges Terrace Perth, Western Australia 6000 T: +61 8 6213 6000 F: +61 8 6213 6455 E: enquiries@inpex.com.au W: INPEX.com.au operates. INPEX believes in providing benefits to these communities and contributing to their sustainable social, economic and environmental development. Identifying and providing opportunities for local businesses and local people, including Aboriginal and Torres Strait Islander peoples is part of this commitment. INPEX has also committed to full, fair and reasonable opportunity for Australian industry to take part in the Project and is committed to getting it right by building effective partnerships through active engagement and consultation. INPEX promotes a safe and harmonious workplace culture in Australia. 安全第一 Anzen Dai Ichi – Safety Number One is a goal, key behaviour, and commitment linked to INPEX’s health, safety and environmental values. The Ichthys LNG Project is a Joint Venture between INPEX group companies (the Operator), major partner TOTAL and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas.