SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
Difficulties with Changing to a Lean Culture: Part IV
Process Improvement – where do we start?
Where will the “human-side” of Lean hit you? Mike Thelen shares experiences with process improvement
in Part IV.

As is the case with any Lean implementation in a Traditional environment, culture (or more specifically
culture change) will be the most difficult obstacle to success. While a company can hire consultants,
develop work teams, and even begin Lean initiatives, if the company only "talks the talk", the initiative
soon becomes just that, talk.

Sustained improvement. Feel like playing jeopardy? What is an extremely difficult part of Lean? By now,
Kaizen has almost become a household word. But what about Kaikaku? Do you know what both words
represent? Kaizen is best known (and most often described) as continuous, incremental improvement.
Kaikaku is perhaps best described as revolutionary improvement. Thus we have two ways to pursue
sustained improvement, evolution and revolution. Kaizen and Kaikaku. But how do we implement or
achieve either?

Once the engine is rolling down the Lean track, how do we keep it moving? We need to change the way
we think about the products we make. Before we can implement Kaizen or Kaikaku (i.e. improve), we
must understand how we make those products.

Process Management – the Traditional approach

In traditional facilities, we track the progress of a product through each department – sales, customer
service, scheduling, manufacturing, assembly, coating, packing, then through shipping to the
transportation company. Each department has specific goals. Each has different objectives day-to-day
than the rest. How do we monitor and judge the success of a product when there are so many and varied
avenues for the product to travel?

Often we fail. Why? A manufacturing cell has two orders due. One is a long run with short setup. The
other, while “hot”, is short run with an expensive setup. An order due later requires the same work.
Often, the first order is run, not due to priority, but due to a desire to perform well (after all, no one likes
the Supervisor bearing down on them).

Lets look at Traditional management through a manufacturing process diagram:
                                Process 2
                                                                                    Unique
                                Machine 1
                                                                                                Process 7
Widget #1                                                                          Machine 1
                                                                                                Machine 1
                                Process 2
                                                                                    Unique
                                Machine 2
                                                                                                Process 7
                                                                                   Machine 2

                                                                                                Machine 2
                                             Process 3
                                Process 2
                                             Machine 1                             Process 6
                                Machine 3                 Process 4                             Process 7
                    Process 1                                          Process 5   Machine 1
                                                          Machine 1                             Machine 3
                    Machine 1                                                                                      Finished
                                                                       Machine 1
  Warehouse                                  Process 3                                                              Goods
                                Process 2                                          Process 6
                                             Machine 2
                                Machine 4                                          Machine 2
                    Process 1                                          Process 5
                                                          Process 4
  Individual Lots   Machine 2                                          Machine 2
                                Process 2                 Machine 2
                                             Process 3                             Process 7
                                Machine 5
                                             Machine 3                             Machine 1
                                                                                                Process 6

                                Process 2                                                       Machine 1
                                                                                   Process 7

                                Machine 6
                                                                                   Machine 2
                                                                                                Process 6

                                Process 2                                                       Machine 2
                                                                                   Process 7

                                Machine 7
                                                                                   Machine 3
Inventory (in the form of Lots) is everywhere, with no structure (or only a perceived structure that isn’t
followed). There is no clear path as any product can and will run anywhere dependent on machine
availability at the time of need. People are so busy trying to find, prioritize, and push work through that
they have no opportunity for process evaluation and improvement. This same diagram can just as easily
(and often does) represent a Sales/Customer Service or Engineering department. If we overlay the
Information side of the process, the diagram can become so cluttered that individual opportunities
become impossible to see.

Product Management – an Alternative approach
Pure product management is also difficult. Perhaps it is best described through the eyes of an
organizational chart:
                                                  Value Stream
                                                    Manager

              Widget #1
                                                                                                         Customer
                                           Production
                Engineer                                                Maintenance
                                            Manager




    Sales/
   Customer          Planner          Process 1             Process 2         Process 3       Shipping
    Service



Here, the Value Stream is managed entirely. There are no “silos” of departments. Each product has
specific personnel throughout the business who are responsible for that product. Structure is very clear
and binary, simple and direct. Support positions often become overstaffed, due to coverage for
absenteeism and knowledge sharing. This can require extensive training too, as maintenance and
engineering must be “experts” on a broad range of machines/components. Theoretically, everyone is
involved heavily in the value stream and teamwork is highly encouraged. Responsibilities are also clearly
defined for all employees in the process.

Hybrid Management – the Toyota approach
Not everyone has worked at Toyota. Through discussions with past employees of TMM and TSSC and
research conducted by many Lean practitioners, it would appear that Toyota takes a “hybrid” approach.

Toyota does have an Engineering department. They do have Manufacturing, Materials, and Support
departments. However, Toyota also has project managers. These individuals are taken from their
current roles (often they are well-proven Engineers) and are given the responsibility of leading projects (to
Toyota, Lexus and the Prius Hybrid were “projects”). These leaders are given little or no authority.

This system allows Toyota to share knowledge across vast numbers of employees. It also maximizes
support staffing. Utilizing value stream management techniques allows for clear and binary paths, while
having departmentalized groups allows for less demand for specific and detailed knowledge of every
component. This system allows”specialists” to be brought in under a project as needed, while still
allowing those specialists to perform necessary job functions in other vital areas of the business.

Management Structures – A visual summary:
Process Mgmt – Vertical Structure                                       Product Mgmt – Horizontal Structure
       Raw Mat’l               All report                               Design – Raw – Comp – Assy - Ship
       Components              to Process Mgrs                          Includes Sales
       Assembly                and Plant “Process”                      Product provides value to the company
       Pack/Ship               Manager                                    - not the process
    - No overlap or concern
    - No follow-through from design to delivery
    - Department-specific goals/ratings
Toyota Mgmt – Process Management with Product Management
                              • Chief engineer with little authority, but responsible for each product
                              • Value-Stream Management

There is no magic pill for Lean initiatives. The Lean process requires time, commitment, and
determination. Companies that cannot envision the long-term commitment to Lean, and only use the
tools for short-term gain, will achieve some limited success. However, without the culture supporting
those tools, the Lean initiative will fail, becoming the "flavor of the week" that everyone knew would not
last.

As Jim Womack once said, “Managers will try anything easy that doesn’t work before they will try anything
hard that does work."

Mike Thelen is Lean Facilitator at Aberdeen, SD based Hub City, Inc., a subsidiary of the Regal-Beloit Corporation,
Beloit, WI. He has led Lean Initiatives in positions from Front-Line Supervisor to System Facilitator in various
corporations since 2001. Mike can be reached at mike.thelen@regalbeloit.com.

Weitere ähnliche Inhalte

Mehr von Association for Manufacturing Excellence

The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesAssociation for Manufacturing Excellence
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Association for Manufacturing Excellence
 
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInAssociation for Manufacturing Excellence
 

Mehr von Association for Manufacturing Excellence (20)

AME Chicago 2019 Conference Preview
AME Chicago 2019 Conference PreviewAME Chicago 2019 Conference Preview
AME Chicago 2019 Conference Preview
 
Value Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to SeeValue Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to See
 
AME Lean Consortia
AME Lean ConsortiaAME Lean Consortia
AME Lean Consortia
 
AME San Diego 2018 Conference Preview
AME San Diego 2018 Conference PreviewAME San Diego 2018 Conference Preview
AME San Diego 2018 Conference Preview
 
Applying for the AME Excellence Award
Applying for the AME Excellence Award Applying for the AME Excellence Award
Applying for the AME Excellence Award
 
AME Boston International Conference Preview
AME Boston International Conference Preview AME Boston International Conference Preview
AME Boston International Conference Preview
 
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
 
Slide share presentation - building a people-centric culture
Slide share presentation - building a people-centric cultureSlide share presentation - building a people-centric culture
Slide share presentation - building a people-centric culture
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)
 
Love and Lean
Love and Lean Love and Lean
Love and Lean
 
Interviewing for Success
Interviewing for SuccessInterviewing for Success
Interviewing for Success
 
Sorry: LinkedIn "Event" app no longer exists
 Sorry: LinkedIn "Event" app no longer exists Sorry: LinkedIn "Event" app no longer exists
Sorry: LinkedIn "Event" app no longer exists
 
Fundamentals of LinkedIn Groups
Fundamentals of LinkedIn GroupsFundamentals of LinkedIn Groups
Fundamentals of LinkedIn Groups
 
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
 
AME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & ConnectionsAME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & Connections
 
Retire the PDCA wedge
Retire the PDCA wedgeRetire the PDCA wedge
Retire the PDCA wedge
 
Advanced Social Networking
Advanced Social NetworkingAdvanced Social Networking
Advanced Social Networking
 
Getting started with social media
Getting started with social mediaGetting started with social media
Getting started with social media
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike ThelenDifficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
 

KĂĽrzlich hochgeladen

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 

KĂĽrzlich hochgeladen (20)

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 

Difficulties With Changing To A Lean Culture Part 04 By Mike Thelen

  • 1. Difficulties with Changing to a Lean Culture: Part IV Process Improvement – where do we start? Where will the “human-side” of Lean hit you? Mike Thelen shares experiences with process improvement in Part IV. As is the case with any Lean implementation in a Traditional environment, culture (or more specifically culture change) will be the most difficult obstacle to success. While a company can hire consultants, develop work teams, and even begin Lean initiatives, if the company only "talks the talk", the initiative soon becomes just that, talk. Sustained improvement. Feel like playing jeopardy? What is an extremely difficult part of Lean? By now, Kaizen has almost become a household word. But what about Kaikaku? Do you know what both words represent? Kaizen is best known (and most often described) as continuous, incremental improvement. Kaikaku is perhaps best described as revolutionary improvement. Thus we have two ways to pursue sustained improvement, evolution and revolution. Kaizen and Kaikaku. But how do we implement or achieve either? Once the engine is rolling down the Lean track, how do we keep it moving? We need to change the way we think about the products we make. Before we can implement Kaizen or Kaikaku (i.e. improve), we must understand how we make those products. Process Management – the Traditional approach In traditional facilities, we track the progress of a product through each department – sales, customer service, scheduling, manufacturing, assembly, coating, packing, then through shipping to the transportation company. Each department has specific goals. Each has different objectives day-to-day than the rest. How do we monitor and judge the success of a product when there are so many and varied avenues for the product to travel? Often we fail. Why? A manufacturing cell has two orders due. One is a long run with short setup. The other, while “hot”, is short run with an expensive setup. An order due later requires the same work. Often, the first order is run, not due to priority, but due to a desire to perform well (after all, no one likes the Supervisor bearing down on them). Lets look at Traditional management through a manufacturing process diagram: Process 2 Unique Machine 1 Process 7 Widget #1 Machine 1 Machine 1 Process 2 Unique Machine 2 Process 7 Machine 2 Machine 2 Process 3 Process 2 Machine 1 Process 6 Machine 3 Process 4 Process 7 Process 1 Process 5 Machine 1 Machine 1 Machine 3 Machine 1 Finished Machine 1 Warehouse Process 3 Goods Process 2 Process 6 Machine 2 Machine 4 Machine 2 Process 1 Process 5 Process 4 Individual Lots Machine 2 Machine 2 Process 2 Machine 2 Process 3 Process 7 Machine 5 Machine 3 Machine 1 Process 6 Process 2 Machine 1 Process 7 Machine 6 Machine 2 Process 6 Process 2 Machine 2 Process 7 Machine 7 Machine 3
  • 2. Inventory (in the form of Lots) is everywhere, with no structure (or only a perceived structure that isn’t followed). There is no clear path as any product can and will run anywhere dependent on machine availability at the time of need. People are so busy trying to find, prioritize, and push work through that they have no opportunity for process evaluation and improvement. This same diagram can just as easily (and often does) represent a Sales/Customer Service or Engineering department. If we overlay the Information side of the process, the diagram can become so cluttered that individual opportunities become impossible to see. Product Management – an Alternative approach Pure product management is also difficult. Perhaps it is best described through the eyes of an organizational chart: Value Stream Manager Widget #1 Customer Production Engineer Maintenance Manager Sales/ Customer Planner Process 1 Process 2 Process 3 Shipping Service Here, the Value Stream is managed entirely. There are no “silos” of departments. Each product has specific personnel throughout the business who are responsible for that product. Structure is very clear and binary, simple and direct. Support positions often become overstaffed, due to coverage for absenteeism and knowledge sharing. This can require extensive training too, as maintenance and engineering must be “experts” on a broad range of machines/components. Theoretically, everyone is involved heavily in the value stream and teamwork is highly encouraged. Responsibilities are also clearly defined for all employees in the process. Hybrid Management – the Toyota approach Not everyone has worked at Toyota. Through discussions with past employees of TMM and TSSC and research conducted by many Lean practitioners, it would appear that Toyota takes a “hybrid” approach. Toyota does have an Engineering department. They do have Manufacturing, Materials, and Support departments. However, Toyota also has project managers. These individuals are taken from their current roles (often they are well-proven Engineers) and are given the responsibility of leading projects (to Toyota, Lexus and the Prius Hybrid were “projects”). These leaders are given little or no authority. This system allows Toyota to share knowledge across vast numbers of employees. It also maximizes support staffing. Utilizing value stream management techniques allows for clear and binary paths, while having departmentalized groups allows for less demand for specific and detailed knowledge of every component. This system allows”specialists” to be brought in under a project as needed, while still allowing those specialists to perform necessary job functions in other vital areas of the business. Management Structures – A visual summary: Process Mgmt – Vertical Structure Product Mgmt – Horizontal Structure Raw Mat’l All report Design – Raw – Comp – Assy - Ship Components to Process Mgrs Includes Sales Assembly and Plant “Process” Product provides value to the company Pack/Ship Manager - not the process - No overlap or concern - No follow-through from design to delivery - Department-specific goals/ratings
  • 3. Toyota Mgmt – Process Management with Product Management • Chief engineer with little authority, but responsible for each product • Value-Stream Management There is no magic pill for Lean initiatives. The Lean process requires time, commitment, and determination. Companies that cannot envision the long-term commitment to Lean, and only use the tools for short-term gain, will achieve some limited success. However, without the culture supporting those tools, the Lean initiative will fail, becoming the "flavor of the week" that everyone knew would not last. As Jim Womack once said, “Managers will try anything easy that doesn’t work before they will try anything hard that does work." Mike Thelen is Lean Facilitator at Aberdeen, SD based Hub City, Inc., a subsidiary of the Regal-Beloit Corporation, Beloit, WI. He has led Lean Initiatives in positions from Front-Line Supervisor to System Facilitator in various corporations since 2001. Mike can be reached at mike.thelen@regalbeloit.com.