SlideShare ist ein Scribd-Unternehmen logo
1 von 45
Downloaden Sie, um offline zu lesen
Capacity and L&D
oGIP Tier 3
TM for oGIP
MC: 0-30 Re
Current State of iGIP
MC
Performance

0-30 average
LC Performance
0-10 average
TIER 3
700 Re 
80 entities 
10 RE average

General challenges:
1.  Sales & Product Knowledge
2.  Culture and focus
Current State of oGIP | Tier 3
Ideal state at end of 2014
30
average per MC
X 80
entities
2400RE
Ideal State
•  LCs doing between 0-10 jump to 20-30
•  LCs doing between 10-15 jump to 30-45
Ideal State at End of 2014
=
The oGIP OD Model
What we are aiming for?
BIG JUMP IN ABSOLUTE AND
RELATIVE RESULTS!
What is this about?
•  Pick focus LCs for oGIP growth in your entity
•  Building Capacity for oGIP
•  Learning and Development
•  Summary of what I need to do (MC)
1.Pick focus LCs for
oGIP growth
Tier 3 entities (0-30 oGIP)
Less than 10 LCs
!
!
•  Ensure most LCs have iGIP as the
focus!
•  Each LC should only have one of the
two GIP programmes as focus!
•  LC Planning support specifically for
TM, Marketing and iGIP!
•  Define how much each LC will jump !
•  No need to cluster LCs into a cluster
by volume as they are all in one
cluster of 0-10 Re!
More than 10 LCs
•  Pick the LCs that will grow in iGIP!
•  Create a cluster for iGIP Focus LCs!
•  Other LCs can focus on iGIP or one
of the GCDP Programmes!
!
Go through the OD Toolkit/content for tier 3
to get more clarity on Focus LCs and focus
programmes!
2. Planning and Building CAPACITY
for the FRUIT PEAK in oGIP
Use TM Planning Tool to Plan for oGIP
	
  
1. Number of
Members in oGIP and
support functions
2. Number of TMP
and TLP Experiences
in oGIP and support
functions
After planning for capacity you can have any
one of these 3 outcomes
1. I do not have
enough Members
in any
programme/
function
2. We have enough
members in oGIP
and support areas
3. We have the right
number of members in
the LC/MC but not
allocated in the right
proportion across
programmes/
functions
Run an OPTIMIZED recruitment for
the fruit peak – 2 weeks!!
1. I do not have
enough
Members in
any
programme/
function
Tips to run an optimized recruitment
1. Clear and focused Promotion of Job description
	
  
Example: Selling the global internship programme to language institutes !
!
2. Specific people responsible for the recruitment
3. Online promotion and Offline promotion ONLY in specific universities
4. Selection based on Interests and Values (striving for excellence, pro active
learner etc.) over only skills for the role
5. When Promotion is on-going through the year, an optimized recruitment
becomes simpler since LC/MC already has a pool of applicants
Determine who is the right member
Skill AttitudeBackground Interest Time
Timeline
Approach
existing sign
ups for TXP
and GCDP
Rejected
applicants
from last
recruitment
Optimized
Selection
1 week 5 days
Optimized
Selection
Value based recruitment
q  Commi%ed	
  	
  and	
  mo(vated	
  members	
  (	
  GIP	
  needs	
  commitment	
  and	
  
persistence)	
  
q  Building	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
2. We have enough
members in oGIP
and support areas
Focus on increasing productivity
through L&D and team minimums
3. We have the right
number of members
in the LC/MC but not
allocated in the right
proportion across
programmes/
functions
Re-allocate to ensure there are the right
number of members in iGIP and all other
functions
How to balance the oGCDP and oGIP support?
Clear JD for members in Exchange
Support
Clear KPIs for each member
Hybrid Members – Marketing or TM
members in oGIP team
Identify where GIP and GCDP tasks
get connected
Go through managing 2
OGX programmes in
the OD Toolkit!
What structure to recruit into?
Structures for…
0-10 Re 10-40 Re
0-10 Start Up LC
VP
Member Member Member Member
Basic Consideration:
•  Focus in 1 sub product – Marketing OR
Teaching
•  Each member goes through Ra-Ma-Re
•  High effort of L&D is expected to retain the
members
•  Consider oGCDP, iGIP or EPs to join this team∞Ra-Ma-Re
Number of members: Depends on efficiency and year goal for oGIP
Job Description:
•  Promotion and raising, matching, and realizing
•  Outgoing preparation seminar
•  Experience Co-delivery
In the 1st year of
operating oGIP, LCA
wants to have 10
realizations in one
subproduct by the end
of the term.
VP oGIP
•  Strategy and
coordination for 1-2
subproducts
management
•  Market Research
•  S&D analysis
Member
3
Member
2
Member
1
JD for each member:
-  Promotion support (virtual and physical)
-  Sign ups follow up
-  EP Raising management
-  Manage matching process
-  Co delivery (EP virtual preparation)
-  Outgoing Preparation Seminar (incl. LEAD for
EP)
-  Follow-up of EP while abroad
-  Reintegration
Example
What
shouldthey
do?
•  SPLIT oGIP and oGCDP LCVPs for focus LCs
•  In case this isn’t possible, create specific oGIP teams for the summer/peak you are
working for within the OGX team at an LC level so that they can be tracked
separately
•  Summer teams/peak you are working for in oGIP can be working to deliver to
maybe 2-3 big entity partners only and this is part of their JD
0-10 Start Up LC
My entity does high volume GCDP and we
are hitting capacity in GCDP : (
What should we do?
Make GCDP team
structures very
productive by making
them project based –
One issue and 1-2
Entity Partners Different LCs jumping
in GCDP and GIP
Programmes to strike
a balance
Specific recruitment
only for oGIP front
office and back office
oGIP Front office and
back office can be part
of the same team
which is an oGIP team
Go through managing 2
OGX programmes in
the OD Toolkit!
2 situations LCs will be in
For LCs - no or very little
available forms
CAPACITY and
STRUCTURES focused on
RAISE
For LCs - available forms
but need to raise more
CAPACITY and
STRUCTURES
Focused on Raise and
match
3. Learning
and
Development
USE TM Planning tool
How do I
plan?
LEARNING AND DEVELOPMENT
However tempting it is to give a lot of webinars or booklet to
your membership.
Remember that we provide experiential learning in AIESEC.
‘Learning from doing’
Sample timeline for July Realizations – can be used for any peak
What kind?
What kind of education cycle to create for LCVPs and Team Leaders?
Teaching and Marketing
knowledge
Online and Offline attraction and
converstion
oGIP Sales knowledge
Team Minimums
Implementation
Complete Supply and Demand
awareness
Attraction and conversion of EPs
Matching Process
Delivering on country partnerships
Continued Raising and Matching
knowledge
Weekly updates on current supply
Delivering Quality Experiences
APRIL APRIL&MAY JUNE
What kind of education cycle to create for new and exisitng members?
Relevance of GIP
Understanding of iGIP and oGIP
Teaching and Marketing knowledge
How to sell
Team Minimums
Supply and Demand understanding
How to raise based on product and S&D
Matching Process understanding
Supply and Demand
Continued Raising and Matching
knowledge
Weekly updates on current supply
Team Management
Matching Process
APRIL APRIL&MAY JUNE
Sample timeline for July Realizations – can be used for any peak
LEARNING AND DEVELOPMENT
For LCs - no or very little
available forms
Education focused on
Raise only
For LCs - available forms
but need to raise more
Education focused on
Raise and Match
For LCs – many high
quality available forms
but need to match
Education focused on
Match
To ensure new members in start up
LCs perform, ensure the right
INDUCTION process
Principles of Induction
•  Induction is a combination of Organizational knowledge and Operational knowledge
•  Effective induction is practical where members learn by DOING
•  Align Induction completely to Gen2015 and the GIP focus – remember, new member
don’t have any mindsets
•  Induction can be completely measurable Eg: Time it takes for a new member to start
performing
Process Overview Induction
Basic Induction
•  The AIESEC Way
•  AIESEC 2015
•  What is Gen2015? What is
the external relevance?
Functional Induction
•  Understanding of GIP and
GCDP
•  Relevance of iGIP, what will
I learn from it
•  Detailed practical
understanding through
simulation
Working in a Team
•  AIESEC is about team
experiences
•  How to work well in a team
•  Team minimums and
principles
Process Overview Induction
Functional Induction
•  Understanding of GIP and
GCDP
•  Relevance of iGIP, what will
I learn from it
•  Detailed practical
understanding through
simulation
ü  Members understand the exchange process in iGIP and oGIP
ü  There is a real simulation where members are given sales sheets
and are doing sales to Eps and Companies
ü  Ensure this is based on focus product and market
ü  Members make calls and do meetings with facilitators who are
companies or EPs
ü  There is a live matching process too to make this real (which can
be aligned to country partners by using names of the same
countries)
ü  For reception, try to get actual trainees
ü  De-brief at the end so members understand the process and then
bring in relevance and scale of GIP growth for members to see the
connection
HANDY TIPS for L&D
1.  Make Virtual learning effective
and fun – Ensure continuity
and consistency
2. Have practical tasks/
assignments at the end of
every virtual session
CONTINUITY AND
CONSISTENCY
PRACTICAL 
3. Base it on exchange flow,
timeline and goals
Exchange timeline
4. Ensure there is customised content
for specific LCs and specific profiles
within LCs.
CUSTOMISED
How to Measure this?
TMP Retention rate
(for new members
and existing team
members
Increase in
Performance over a
period of time
Time to start performing
Eg: from 1 month to 1
week – for new members
and team leaders
Increase in
Performance over a
period of time
Summary oGIP 0-30
•  Pick focus LCs for GIP growth
•  Plan for number of members needed through TM
Planning tool
•  Take action based on your current reality and
recruit into the right structures
•  Create a specific Learning and Development cycle
(embed Sales, Product, Supply and Demand and
Marketing into this) just for the fruit peak
•  Focus on Induction Process
•  Implement Team Minimums
Role of MC!
•  Pick focus LCs for GIP growth
•  Support Planning process - Plan for number of
members needed through TM Planning tool
•  Take action based on your current reality and
recruit into the right structures
•  Create a specific Learning and Development cycle
•  Focus on Induction Process
•  Implement Team Minimums (not just the MCVP
TM, all MCVPs need to do this)
Role of MC!
•  Through data, identify the CHALLENGE of LCs to
figure out what will lead to an increase in
productivity!
Eg: Will increasing the current TMP Retention rate
lead to higher productivity
Will re allocating membership in a certain way lead
to higher productivity etc etc!
•  Set CLEAR GOALS for PRODUCTIVITY with LCs
per programme, specifically in oGIP and measure
constantly

Weitere ähnliche Inhalte

Was ist angesagt?

oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyAIESEC
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4AIESEC
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsAIESEC
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions AIESEC
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DAIESEC
 
oGCDP Tier 1 IXP Strategy
 oGCDP Tier 1 IXP Strategy oGCDP Tier 1 IXP Strategy
oGCDP Tier 1 IXP StrategyAIESEC
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...Christina Kelman
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement maggie4667
 
GIP - Implementation Planning Tier 1
GIP - Implementation Planning Tier 1GIP - Implementation Planning Tier 1
GIP - Implementation Planning Tier 1AIESEC
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1AIESEC
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPAIESEC
 
AIESEC Poland LC's growth model launch at NPM 2015
AIESEC Poland LC's growth model launch at NPM 2015AIESEC Poland LC's growth model launch at NPM 2015
AIESEC Poland LC's growth model launch at NPM 2015aiesec_poland
 
Specific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuSpecific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuTania Serbanoiu
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksAIESEC
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementAIESEC
 
Teaching sub product definition and recommendation output
Teaching sub product definition and recommendation outputTeaching sub product definition and recommendation output
Teaching sub product definition and recommendation outputmaggie4667
 
Incoming GIP Re-Raising for Tier 1
Incoming GIP Re-Raising for Tier 1Incoming GIP Re-Raising for Tier 1
Incoming GIP Re-Raising for Tier 1AIESEC
 

Was ist angesagt? (20)

oGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergyoGCDP Tier 2 Structures for marketing and oGCDP synergy
oGCDP Tier 2 Structures for marketing and oGCDP synergy
 
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
 
iGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projectsiGCDP Tier 2 Learning for national and local projects
iGCDP Tier 2 Learning for national and local projects
 
oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions oGCDP Tier 1 Structures for university expansions
oGCDP Tier 1 Structures for university expansions
 
iGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&DiGCDP Tier 3 structures and L&D
iGCDP Tier 3 structures and L&D
 
oGCDP Tier 1 IXP Strategy
 oGCDP Tier 1 IXP Strategy oGCDP Tier 1 IXP Strategy
oGCDP Tier 1 IXP Strategy
 
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
AIESEC Indonesia | oGCDP Summit 2014 | oGCDP and Program Marketing Synergy Si...
 
Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement Aiesec international 2012 2013 strategy achievement
Aiesec international 2012 2013 strategy achievement
 
GIP - Implementation Planning Tier 1
GIP - Implementation Planning Tier 1GIP - Implementation Planning Tier 1
GIP - Implementation Planning Tier 1
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1
 
iGCDP
iGCDPiGCDP
iGCDP
 
Synergy, Raising,MOS and OS
Synergy, Raising,MOS and OSSynergy, Raising,MOS and OS
Synergy, Raising,MOS and OS
 
iGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDPiGIP Tier 1 Balance GIP and GCDP
iGIP Tier 1 Balance GIP and GCDP
 
AIESEC Poland LC's growth model launch at NPM 2015
AIESEC Poland LC's growth model launch at NPM 2015AIESEC Poland LC's growth model launch at NPM 2015
AIESEC Poland LC's growth model launch at NPM 2015
 
Specific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiuSpecific questionnaire gi po tania serbanoiu
Specific questionnaire gi po tania serbanoiu
 
iGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaksiGCDP Tier 4 - Focus on peaks
iGCDP Tier 4 - Focus on peaks
 
oGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline ManagementoGIP Tier 1 Advanced Pipeline Management
oGIP Tier 1 Advanced Pipeline Management
 
TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15TMP TLP_STEERING TEAM 14.15
TMP TLP_STEERING TEAM 14.15
 
Teaching sub product definition and recommendation output
Teaching sub product definition and recommendation outputTeaching sub product definition and recommendation output
Teaching sub product definition and recommendation output
 
Incoming GIP Re-Raising for Tier 1
Incoming GIP Re-Raising for Tier 1Incoming GIP Re-Raising for Tier 1
Incoming GIP Re-Raising for Tier 1
 

Ähnlich wie Build Capacity and Drive Growth in oGIP Tier 3 LCs

iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DAIESEC
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationAIESEC
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development AIESEC
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmesAIESEC
 
Taking Gen2015 To My Entity
Taking Gen2015 To My EntityTaking Gen2015 To My Entity
Taking Gen2015 To My EntityAIESEC
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiersChristina Kelman
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryFirnando Buenayre
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP AIESEC
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementAIESEC
 
Ixp strategy (updated)
Ixp strategy (updated)Ixp strategy (updated)
Ixp strategy (updated)Sophia Fan
 
Module 2 - The Nuts and Bolts of Apprenticeships
Module 2  - The Nuts and Bolts of Apprenticeships Module 2  - The Nuts and Bolts of Apprenticeships
Module 2 - The Nuts and Bolts of Apprenticeships caniceconsulting
 
Tier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODTier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODAIESEC
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueFirnando Buenayre
 
AIESEC| Italy 1415| MC | Expansion Growth Model
AIESEC| Italy 1415| MC | Expansion Growth ModelAIESEC| Italy 1415| MC | Expansion Growth Model
AIESEC| Italy 1415| MC | Expansion Growth ModelGuiscardo Urso
 

Ähnlich wie Build Capacity and Drive Growth in oGIP Tier 3 LCs (20)

iGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&DiGIP Tier 3 structures and L&D
iGIP Tier 3 structures and L&D
 
iGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementationiGIP Tier 2 Structures, L&D and Team Minimums implementation
iGIP Tier 2 Structures, L&D and Team Minimums implementation
 
Optimized Learning and Development
Optimized Learning and Development Optimized Learning and Development
Optimized Learning and Development
 
Balancing growth in both OGX programmes
Balancing growth in both OGX programmesBalancing growth in both OGX programmes
Balancing growth in both OGX programmes
 
Balance gcdp and gip
Balance gcdp and gipBalance gcdp and gip
Balance gcdp and gip
 
Lets take action
Lets take actionLets take action
Lets take action
 
Lets take action
Lets take actionLets take action
Lets take action
 
TM Structures
TM StructuresTM Structures
TM Structures
 
NCF Customized in oGIP
NCF Customized in oGIPNCF Customized in oGIP
NCF Customized in oGIP
 
Taking Gen2015 To My Entity
Taking Gen2015 To My EntityTaking Gen2015 To My Entity
Taking Gen2015 To My Entity
 
Od framework and role across tiers
Od framework and role across tiersOd framework and role across tiers
Od framework and role across tiers
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
 
iGCDP Quality Capacity
iGCDP Quality CapacityiGCDP Quality Capacity
iGCDP Quality Capacity
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP
 
Tier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline ManagementTier 1 Advanced Pipeline Management
Tier 1 Advanced Pipeline Management
 
Ixp strategy (updated)
Ixp strategy (updated)Ixp strategy (updated)
Ixp strategy (updated)
 
Module 2 - The Nuts and Bolts of Apprenticeships
Module 2  - The Nuts and Bolts of Apprenticeships Module 2  - The Nuts and Bolts of Apprenticeships
Module 2 - The Nuts and Bolts of Apprenticeships
 
Tier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of ODTier 1 and Tier 2 role of OD
Tier 1 and Tier 2 role of OD
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
 
AIESEC| Italy 1415| MC | Expansion Growth Model
AIESEC| Italy 1415| MC | Expansion Growth ModelAIESEC| Italy 1415| MC | Expansion Growth Model
AIESEC| Italy 1415| MC | Expansion Growth Model
 

Mehr von AIESEC

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentationAIESEC
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017AIESEC
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction GuidelineAIESEC
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership SelectionAIESEC
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership PlanningAIESEC
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP AIESEC
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of whatAIESEC
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product sessionAIESEC
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAIESEC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom bookAIESEC
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odmAIESEC
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_successAIESEC
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_cultureAIESEC
 
Our role as p
Our role as pOur role as p
Our role as pAIESEC
 
P tips for planning
P tips for planningP tips for planning
P tips for planningAIESEC
 
Role of lcp
Role of lcpRole of lcp
Role of lcpAIESEC
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognitionAIESEC
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teamsAIESEC
 
Building working culture
Building working cultureBuilding working culture
Building working cultureAIESEC
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefellerAIESEC
 

Mehr von AIESEC (20)

AI 1718 plan presentation
AI 1718 plan presentationAI 1718 plan presentation
AI 1718 plan presentation
 
The AIESECer Survey March 2017
The AIESECer Survey March 2017The AIESECer Survey March 2017
The AIESECer Survey March 2017
 
GET: Induction Guideline
GET: Induction GuidelineGET: Induction Guideline
GET: Induction Guideline
 
GET: Membership Selection
GET: Membership SelectionGET: Membership Selection
GET: Membership Selection
 
GET: Membership Planning
GET: Membership PlanningGET: Membership Planning
GET: Membership Planning
 
APLS-IR guide for LCP
APLS-IR guide for LCP APLS-IR guide for LCP
APLS-IR guide for LCP
 
APLS-Clarity of what
APLS-Clarity of whatAPLS-Clarity of what
APLS-Clarity of what
 
APLS-iGV product session
APLS-iGV product sessionAPLS-iGV product session
APLS-iGV product session
 
APLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LCAPLS-Drive the ambitions of my LC
APLS-Drive the ambitions of my LC
 
The ultimate lcp wisdom book
The ultimate lcp wisdom bookThe ultimate lcp wisdom book
The ultimate lcp wisdom book
 
Planning planning framework odm
Planning  planning framework odmPlanning  planning framework odm
Planning planning framework odm
 
Building culture of_success
Building culture of_successBuilding culture of_success
Building culture of_success
 
Building sales driven_culture
Building sales driven_cultureBuilding sales driven_culture
Building sales driven_culture
 
Our role as p
Our role as pOur role as p
Our role as p
 
P tips for planning
P tips for planningP tips for planning
P tips for planning
 
Role of lcp
Role of lcpRole of lcp
Role of lcp
 
Building culture of excellence+recognition
Building culture of excellence+recognitionBuilding culture of excellence+recognition
Building culture of excellence+recognition
 
[Tm]forming teams
[Tm]forming teams[Tm]forming teams
[Tm]forming teams
 
Building working culture
Building working cultureBuilding working culture
Building working culture
 
Building high performance_culture_rockefeller
Building high performance_culture_rockefellerBuilding high performance_culture_rockefeller
Building high performance_culture_rockefeller
 

Kürzlich hochgeladen

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 

Kürzlich hochgeladen (16)

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 

Build Capacity and Drive Growth in oGIP Tier 3 LCs

  • 2. TM for oGIP MC: 0-30 Re
  • 3. Current State of iGIP MC Performance 0-30 average LC Performance 0-10 average TIER 3 700 Re 80 entities 10 RE average General challenges: 1.  Sales & Product Knowledge 2.  Culture and focus Current State of oGIP | Tier 3
  • 4. Ideal state at end of 2014 30 average per MC X 80 entities 2400RE Ideal State •  LCs doing between 0-10 jump to 20-30 •  LCs doing between 10-15 jump to 30-45 Ideal State at End of 2014 =
  • 5. The oGIP OD Model
  • 6. What we are aiming for? BIG JUMP IN ABSOLUTE AND RELATIVE RESULTS!
  • 7. What is this about? •  Pick focus LCs for oGIP growth in your entity •  Building Capacity for oGIP •  Learning and Development •  Summary of what I need to do (MC)
  • 8. 1.Pick focus LCs for oGIP growth
  • 9. Tier 3 entities (0-30 oGIP) Less than 10 LCs ! ! •  Ensure most LCs have iGIP as the focus! •  Each LC should only have one of the two GIP programmes as focus! •  LC Planning support specifically for TM, Marketing and iGIP! •  Define how much each LC will jump ! •  No need to cluster LCs into a cluster by volume as they are all in one cluster of 0-10 Re! More than 10 LCs •  Pick the LCs that will grow in iGIP! •  Create a cluster for iGIP Focus LCs! •  Other LCs can focus on iGIP or one of the GCDP Programmes! !
  • 10. Go through the OD Toolkit/content for tier 3 to get more clarity on Focus LCs and focus programmes!
  • 11. 2. Planning and Building CAPACITY for the FRUIT PEAK in oGIP
  • 12. Use TM Planning Tool to Plan for oGIP   1. Number of Members in oGIP and support functions 2. Number of TMP and TLP Experiences in oGIP and support functions
  • 13. After planning for capacity you can have any one of these 3 outcomes 1. I do not have enough Members in any programme/ function 2. We have enough members in oGIP and support areas 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/ functions
  • 14. Run an OPTIMIZED recruitment for the fruit peak – 2 weeks!! 1. I do not have enough Members in any programme/ function
  • 15. Tips to run an optimized recruitment 1. Clear and focused Promotion of Job description   Example: Selling the global internship programme to language institutes ! ! 2. Specific people responsible for the recruitment 3. Online promotion and Offline promotion ONLY in specific universities 4. Selection based on Interests and Values (striving for excellence, pro active learner etc.) over only skills for the role 5. When Promotion is on-going through the year, an optimized recruitment becomes simpler since LC/MC already has a pool of applicants
  • 16. Determine who is the right member Skill AttitudeBackground Interest Time
  • 17. Timeline Approach existing sign ups for TXP and GCDP Rejected applicants from last recruitment Optimized Selection 1 week 5 days
  • 18. Optimized Selection Value based recruitment q  Commi%ed    and  mo(vated  members  (  GIP  needs  commitment  and   persistence)   q  Building                                                                  
  • 19. 2. We have enough members in oGIP and support areas Focus on increasing productivity through L&D and team minimums
  • 20. 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/ functions Re-allocate to ensure there are the right number of members in iGIP and all other functions
  • 21. How to balance the oGCDP and oGIP support? Clear JD for members in Exchange Support Clear KPIs for each member Hybrid Members – Marketing or TM members in oGIP team Identify where GIP and GCDP tasks get connected
  • 22. Go through managing 2 OGX programmes in the OD Toolkit!
  • 23. What structure to recruit into?
  • 25. 0-10 Start Up LC VP Member Member Member Member Basic Consideration: •  Focus in 1 sub product – Marketing OR Teaching •  Each member goes through Ra-Ma-Re •  High effort of L&D is expected to retain the members •  Consider oGCDP, iGIP or EPs to join this team∞Ra-Ma-Re Number of members: Depends on efficiency and year goal for oGIP Job Description: •  Promotion and raising, matching, and realizing •  Outgoing preparation seminar •  Experience Co-delivery
  • 26. In the 1st year of operating oGIP, LCA wants to have 10 realizations in one subproduct by the end of the term. VP oGIP •  Strategy and coordination for 1-2 subproducts management •  Market Research •  S&D analysis Member 3 Member 2 Member 1 JD for each member: -  Promotion support (virtual and physical) -  Sign ups follow up -  EP Raising management -  Manage matching process -  Co delivery (EP virtual preparation) -  Outgoing Preparation Seminar (incl. LEAD for EP) -  Follow-up of EP while abroad -  Reintegration Example What shouldthey do?
  • 27. •  SPLIT oGIP and oGCDP LCVPs for focus LCs •  In case this isn’t possible, create specific oGIP teams for the summer/peak you are working for within the OGX team at an LC level so that they can be tracked separately •  Summer teams/peak you are working for in oGIP can be working to deliver to maybe 2-3 big entity partners only and this is part of their JD 0-10 Start Up LC
  • 28. My entity does high volume GCDP and we are hitting capacity in GCDP : ( What should we do? Make GCDP team structures very productive by making them project based – One issue and 1-2 Entity Partners Different LCs jumping in GCDP and GIP Programmes to strike a balance Specific recruitment only for oGIP front office and back office oGIP Front office and back office can be part of the same team which is an oGIP team
  • 29. Go through managing 2 OGX programmes in the OD Toolkit!
  • 30. 2 situations LCs will be in For LCs - no or very little available forms CAPACITY and STRUCTURES focused on RAISE For LCs - available forms but need to raise more CAPACITY and STRUCTURES Focused on Raise and match
  • 32. USE TM Planning tool How do I plan?
  • 33. LEARNING AND DEVELOPMENT However tempting it is to give a lot of webinars or booklet to your membership. Remember that we provide experiential learning in AIESEC. ‘Learning from doing’
  • 34. Sample timeline for July Realizations – can be used for any peak What kind? What kind of education cycle to create for LCVPs and Team Leaders? Teaching and Marketing knowledge Online and Offline attraction and converstion oGIP Sales knowledge Team Minimums Implementation Complete Supply and Demand awareness Attraction and conversion of EPs Matching Process Delivering on country partnerships Continued Raising and Matching knowledge Weekly updates on current supply Delivering Quality Experiences APRIL APRIL&MAY JUNE
  • 35. What kind of education cycle to create for new and exisitng members? Relevance of GIP Understanding of iGIP and oGIP Teaching and Marketing knowledge How to sell Team Minimums Supply and Demand understanding How to raise based on product and S&D Matching Process understanding Supply and Demand Continued Raising and Matching knowledge Weekly updates on current supply Team Management Matching Process APRIL APRIL&MAY JUNE Sample timeline for July Realizations – can be used for any peak
  • 36. LEARNING AND DEVELOPMENT For LCs - no or very little available forms Education focused on Raise only For LCs - available forms but need to raise more Education focused on Raise and Match For LCs – many high quality available forms but need to match Education focused on Match
  • 37. To ensure new members in start up LCs perform, ensure the right INDUCTION process
  • 38. Principles of Induction •  Induction is a combination of Organizational knowledge and Operational knowledge •  Effective induction is practical where members learn by DOING •  Align Induction completely to Gen2015 and the GIP focus – remember, new member don’t have any mindsets •  Induction can be completely measurable Eg: Time it takes for a new member to start performing
  • 39. Process Overview Induction Basic Induction •  The AIESEC Way •  AIESEC 2015 •  What is Gen2015? What is the external relevance? Functional Induction •  Understanding of GIP and GCDP •  Relevance of iGIP, what will I learn from it •  Detailed practical understanding through simulation Working in a Team •  AIESEC is about team experiences •  How to work well in a team •  Team minimums and principles
  • 40. Process Overview Induction Functional Induction •  Understanding of GIP and GCDP •  Relevance of iGIP, what will I learn from it •  Detailed practical understanding through simulation ü  Members understand the exchange process in iGIP and oGIP ü  There is a real simulation where members are given sales sheets and are doing sales to Eps and Companies ü  Ensure this is based on focus product and market ü  Members make calls and do meetings with facilitators who are companies or EPs ü  There is a live matching process too to make this real (which can be aligned to country partners by using names of the same countries) ü  For reception, try to get actual trainees ü  De-brief at the end so members understand the process and then bring in relevance and scale of GIP growth for members to see the connection
  • 41. HANDY TIPS for L&D 1.  Make Virtual learning effective and fun – Ensure continuity and consistency 2. Have practical tasks/ assignments at the end of every virtual session CONTINUITY AND CONSISTENCY PRACTICAL 3. Base it on exchange flow, timeline and goals Exchange timeline 4. Ensure there is customised content for specific LCs and specific profiles within LCs. CUSTOMISED
  • 42. How to Measure this? TMP Retention rate (for new members and existing team members Increase in Performance over a period of time Time to start performing Eg: from 1 month to 1 week – for new members and team leaders Increase in Performance over a period of time
  • 43. Summary oGIP 0-30 •  Pick focus LCs for GIP growth •  Plan for number of members needed through TM Planning tool •  Take action based on your current reality and recruit into the right structures •  Create a specific Learning and Development cycle (embed Sales, Product, Supply and Demand and Marketing into this) just for the fruit peak •  Focus on Induction Process •  Implement Team Minimums
  • 44. Role of MC! •  Pick focus LCs for GIP growth •  Support Planning process - Plan for number of members needed through TM Planning tool •  Take action based on your current reality and recruit into the right structures •  Create a specific Learning and Development cycle •  Focus on Induction Process •  Implement Team Minimums (not just the MCVP TM, all MCVPs need to do this)
  • 45. Role of MC! •  Through data, identify the CHALLENGE of LCs to figure out what will lead to an increase in productivity! Eg: Will increasing the current TMP Retention rate lead to higher productivity Will re allocating membership in a certain way lead to higher productivity etc etc! •  Set CLEAR GOALS for PRODUCTIVITY with LCs per programme, specifically in oGIP and measure constantly