Weitere ähnliche Inhalte
Ähnlich wie Standards based interoperability g gorbach arc orlando 2008
Ähnlich wie Standards based interoperability g gorbach arc orlando 2008 (20)
Mehr von ARC Advisory Group
Mehr von ARC Advisory Group (20)
Kürzlich hochgeladen (20)
Standards based interoperability g gorbach arc orlando 2008
- 1. Standards-based
St d d b d
Interoperability:
p y
An Update
February 2008
Greg Gorbach
Vice President
ARC Advisory Group
y p
ggorbach@arcweb.com
- 2. Leading Manufacturers Connect P2B
Source: ARC Survey of Manufacturers, 2007
Roll-up Info From Multiple Integration Technology
Plants
Leaders
Leaders
Competitors Competitors
Followers Followers
0% 20% 40% 60% 80% 100% 0% 50% 100%
P2B Business Process SOA for Manufacturing
Synchronization
Leaders Leaders
Competitors Competitors
Followers Followers
0% 20% 40% 60% 80% 0% 20% 40% 60% 80%
Using Piloting or Implementing Exploring
3
© ARC Advisory Group
- 3. Standards-Based P2B Interoperability
A Brief Review of Activities
Early Key Events
• Users trigger SAP interest:
• 2003 2004 - Process, Discrete Workshops
2003, 200 k h
• ISA/OAGi agreement signed: end 2005
User Meetings at ARC Forum: February 2006
g y
• Interested in standards convergence, esp. P2B
• Need short time frame: 1 year
• Standards groups ready to step up
Customer Advisory Council and Guideline Working
Group formed: Feb/Mar 2006
4
© ARC Advisory Group
- 5. Standards Convergence
Status – February 2007
A methodology has been developed for creating ISA
content in OAGIS
The OAGi Board of Directors has agreed to express the
ISA-95 data model in OAGIS, and BODs are being
c ea ed
created
ISA-95 has been improved with:
• UN/CEFACT Core Components (ongoing)
• OAGIS BOD messaging, nouns, verbs, etc.
i b t
B2MMLv4 supports ISA-95 object structures by
themselves or wrapped in an OAGIS-style transaction
container
t i
6
© ARC Advisory Group
- 6. Two ISA-95 Implementations:
Status – February 2007
B2MML
• Supports UN/CEFACT core components using OAGIS
core component schema
• Implemented ISA-95 transactions as subset of
OAGIS transactions
• Extensions permit inclusion of OAGIS components in
B2MML documents
OAGIS
• OAGi Board of Directors authorized incorporating the
ISA SP-95 Data Model into the OAGIS standard
• BODs based on the ISA-SP95 data model are being
ISA SP95
developed (starting with Production Performance
and Production Schedule)
• Users can map back and forth from OAGIS to B2MML
by closely aligning some of their messages to the
B2MML implementation.
7
© ARC Advisory Group
- 7. Current Status - February 2008
Both Customer Advisory Council and
Manufacturing Interoperability Guideline
Working Group No Longer Active
OpenO&M continuing standards collaboration
p g
activities
OAGi (OAGIS BODS) and WBF (B2MML)
Implementations of ISA95 Are Proceeding in
Parallel
8
© ARC Advisory Group
- 8. OAGI and ISA95
OAGIS Release 9.2 includes the new ISA-95
based BODs
Target Release Date: February 1, 2008
11
© ARC Advisory Group
- 9. ISA S-95 Production Schedule Model
Production
Schedule
Is made up of
1..n
Corresponds
Product to a Production
Production Request
Rule
Is made up of
1..n 0..n
Corresponds Requested
Process to a Segment Segment
Segment Requirement Response
May contain
0..n 0..n 0..n 0..n 0..n 0..n
Production
P d ti Personnel Equipment Material Produced Material Consumed Consumable
Parameter Requirement Requirement Requirement Requirement Expected
Is associated
to either
1..n 1..n 1..n 1..n 1..n
Personnel Equipment Material Produced Material Consumed Consumable
Requirement Requirement Requirement Requirement Expected
Property Property Property Property Property
Product Corresponds to Corresponds to Corresponds to Corresponds to
Parameter element in element in element in element in
Process
Parameter Personnel Equipment Material
Model Model Model
12
© ARC Advisory Group
- 10. OAGIS Production Schedule BOD (Draft)
13
Copyright © 1995 - 2007 Open Applications Group, Inc. All ARC Advisory Group
© rights reserved
- 11. ISA S-95 Production Performance Model
Production
Performance
Is made up of
1..n
Production
Response
Is made up of
1..n
Corresponds
Process to a Segment
Segment Response
May contain
0..n 0..n 0..n 0..n 0..n 0..n
Production Personnel Equipment Material Produced Material Consumed Consumable
Data Actual Actual Actual Actual Actual
1..n 1..n 1..n 1..n 1..n
Personnel Equipment Material Produced Material Consumed Consumable
Actual Actual Actual
A t l Actual Actual
Property Property Property Property Property
Corresponds to Corresponds to Corresponds to Corresponds to
element in element in element in element in
Personnel Equipment Material
Model Model Model
14
© ARC Advisory Group
- 12. OAGIS Production Performance BOD
(Draft)
15
Copyright © 1995 - 2007 Open Applications Group, Inc. AllARC Advisory Group
© rights reserved
- 13. Ongoing Collaboration
OAGi is building the ISA-95 Data Model into
the OAGIS standard to provide a broader
solution for OAGIS users.
OAGIS is sharing their data model with ISA-
g
95
With BODs based on the ISA-95 data model,
the user can more easily map between OAGIS
and B2MML.
16
© ARC Advisory Group
- 14. WBF B2MML
B2MML v04 is the latest version
Many enhancements improve alignment between
B2MML and OAGIS 9.0
For example:
• B2MML is d i
i designed t i
d to implement a subset of th OAGiS 9 0
l t b t f the 9.0
message rules that are consistent with the ISA 95 Part 5
definitions. The B2MML ApplicationArea and verb
elements are subsets of the full OAGIS 9.0 specifications,
9 0 specifications
with minor differences.
• In order to be consistent with the OAGIS message
transaction format, a change was made to use the
format
UN/CEFACT core component types as the base types for all
elements.
Source: WBF.
18
© ARC Advisory Group
- 15. Thank You.
For more information, contact the author at
ggorbach@arcweb.com or visit our web pages at
www.arcweb.com
www arcweb com
19
© ARC Advisory Group