Chapter 7 Push and Pull  Production Control Systems MRP  and  JIT
Push and Pull Control Systems ,[object Object],[object Object],[object Object],[object Object]
Difference between MRP and JIT ,[object Object],[object Object],[object Object],[object Object]
MRP Basics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Schematic of the  Productive System Fig. 7-1
Production Plan ,[object Object],[object Object],[object Object]
Data sources for determining the MPS ,[object Object],[object Object],[object Object],[object Object],[object Object]
Success of MRP ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Major phases of the control system ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Three Major Control  Phases of the Productive System Fig. 7-2
Explosion Calculus Bill of Material (BOM) explosion ,[object Object],[object Object],[object Object]
Typical Product Structure  Diagram Fig. 7-3
Trumpet and Subassemblies Fig. 7-4
Product Structure Diagram  for Harmon Trumpet Fig. 7-5
Indented BOM ,[object Object],[object Object],[object Object],[object Object],[object Object]
38 76 14 45 112 26 12 32 42 42 Net demand Expect 23 in inventory at the end of week 7 9 6 12 Scheduled Receipts Returns 38 76 14 45 112 26 21 38 42 77 Demand 17 16 15 14 13 12 11 10 9 8 Week
MRP calculations for Bell assembly 38 76 14 45 112 26 12 32 42 42 Planned order release (lot for lot) 38 76 14 45 112 26 12 32 42 42 Time-phased Net Reqts 38 76 14 45 112 26 12 32 42 42 Lead time Net Reqts 38 76 14 45 112 26 12 32 42 42 Gross Reqts 17 16 15 14 13 12 11 10 9 8 7 6 Week
MRP calculations for the valves 30 60 186 On-hand Inv. 96 Scheduled Receipts 114 228 42 135 336 78 36 66 Planned order release (lot for lot) 114 228 42 135 336 78 36 66 Time-phased Net Reqts 114 228 42 135 336 78 36 66 0 0 Net Reqts 114 228 42 135 336 78 36 96 126 126 Gross Reqts 13 12 11 10 9 8 7 6 5 4 3 2 Week
Incorporating the lot-sizing algorithms into the explosion calculus ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Starting in week 4 C(1)=132 C(2)=[132+0.6(42)]/2=78.6 C(3)=[132+0.6(42+2(32))]/3=65.2 C(4)=[132+0.6(42+2(32)+3(12))]/4=54.3 C(5)=[132+0.6(42+2(32)+3(12)+4(26))]/5=55.92      y 4 = 42+42+32+12=128 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts . 13 12 11 10 9 8 7 6 5 4 Week
Starting in week 8: C(1)=132 C(2)=[132+0.6(112)]/2=99.6 C(3)=[112+0.6(112+2(45))]/3=84.4 C(4)=[112+0.6(112+2(45)+3(14))]/4=69.6 C(5)=[112+0.6(112+2(45)+3(14)+4(76))]/5=92.16    y 8 = 26+112+45+14=197 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts. 13 12 11 10 9 8 7 6 5 4 Week
Starting in week 12: C(1)=132 C(2)=[132+0.6(38)]/2=77.4    y 12 = 76+38=114 Week 4  5  6   7  8   9  10  11   12   13 Pon  128   0  0   0  197   0   0  0   114   0 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts. 13 12 11 10 9 8 7 6 5 4 Week
Part Period Balancing ,[object Object]
Order horizon   total holding cost 1 0 2 0.6(42)=25.2 3 0.6(42+2(32))=64.8 4 0.6(42+2(32)+3(12))=86.4 5 0.6(42+2(32)+3(12)+4(26))=148.8  > 132   Since 148.8 is closer to 132 than 86.4 the order horizon is 5 periods  _________________________________________________________  1 0 2 0.6(45)=27=27 3 0.6(45+2(14))=43.8 4 0.6(45+2(14)+3(76))=180.6  > 132   Since 121.2 is closer to 132 than 151.2 the order horizon is 3 periods _________________________________________________________ 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts . 13 12 11 10 9 8 7 6 5 4 Week
MRP calculations for valve casing Inv Del Ord Net Reqt 0 38 0 14 59 171 0 12 44 86 128 42 4 12 0 114 0 0 0 197 0 0 0 128 0 114 0 0 0 197 0 0 0 38 76 14 45 112 26 32 42 38 76 14 45 112 26 12 32 42 42 17 16 15 14 13 12 11 10 9 8 7 6 5
Cost comparison ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lower level of valve casing (valves) SM Orders  198 0  0  0  495   0  0  0  342   0  0  0  0 Time-Phased Net Reqts OH inv Receipts Gross Rqts. 0 0 0 0 342 0 0 0 495 0 0 0 198 1 0 342 0 0 0 495 0 0 0 198 0 96 96 96 0 186 96 0 342 0 0 0 591 0 0 0 384 13 12 11 10 9 8 7 6 5 4 3 2
Lot-sizing with capacity constraints ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lot shifting technique ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The improvement step ,[object Object],[object Object],[object Object],0 0 0 0 272 295 0 91 20 Excess capacity 30 50 120 50 28 105 200 109 100 y 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 r’
Calculations of the improvement step 0 0 0 0 272 295 0 91 20 Excess capacity 242 192 30 50 120 50 28 105 200 109 100 y 0 0 58 108 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
Calculations continued 0 0 0 0 192 295 0 91 20 Excess capacity 142 0 0 120 50 108 105 200 109 100 y 0 158 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
0 0 0 0 142 295 0 91 20 Excess capacity 300 137 0 0 120 0 158 105 200 109 100 y 0 263 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
0 0 0 0 300 137 0 91 20 Excess capacity 0 0 120 0 0 263 200 109 100 y 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
Cost comparison ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

Production Management
Production ManagementProduction Management
Production ManagementHiten Patel
 
production planning and control
production planning and controlproduction planning and control
production planning and controlParitosh Kasaudhan
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTnishu tyagi
 
Master production schedule
Master production scheduleMaster production schedule
Master production scheduleyashbhhardwaj260
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation managementSaravanan Murugan
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)Manoj Subedi
 
Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations managementVaibhav Govindjiwala
 
production planning and control
production planning and controlproduction planning and control
production planning and controlReshma Babu
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & ForecastingJenıstön Delımä
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...viveksangwan007
 

Was ist angesagt? (20)

Production Management
Production ManagementProduction Management
Production Management
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Just in time
Just in timeJust in time
Just in time
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations management
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
Line balancing
Line balancingLine balancing
Line balancing
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 

Andere mochten auch

Push and pull -strategy
Push and pull -strategyPush and pull -strategy
Push and pull -strategythiruvalla
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Schedulingpilly_leon
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production scheduleyashbhhardwaj260
 
Master scheduling
Master schedulingMaster scheduling
Master schedulingmehrdad66
 
Push vs pull Advantages & Disadvantages
Push vs pull Advantages & DisadvantagesPush vs pull Advantages & Disadvantages
Push vs pull Advantages & DisadvantagesSwapnil Gharde
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 

Andere mochten auch (11)

Push and pull -strategy
Push and pull -strategyPush and pull -strategy
Push and pull -strategy
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
small and effective ppt on master production schedule
small and effective ppt on master production schedulesmall and effective ppt on master production schedule
small and effective ppt on master production schedule
 
Master scheduling
Master schedulingMaster scheduling
Master scheduling
 
Push vs pull Advantages & Disadvantages
Push vs pull Advantages & DisadvantagesPush vs pull Advantages & Disadvantages
Push vs pull Advantages & Disadvantages
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Push & Pull
Push & PullPush & Pull
Push & Pull
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 

Ähnlich wie Push And Pull Production Systems Chap7 Ppt)

Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]Pankaj Rathod
 
Algebra and Trigonometry 9th Edition Larson Solutions Manual
Algebra and Trigonometry 9th Edition Larson Solutions ManualAlgebra and Trigonometry 9th Edition Larson Solutions Manual
Algebra and Trigonometry 9th Edition Larson Solutions Manualkejeqadaqo
 
Arna Friend Controls II Final
Arna Friend Controls II FinalArna Friend Controls II Final
Arna Friend Controls II FinalArna Friend
 
SQL Tuning 101 - Sep 2013
SQL Tuning 101 - Sep 2013SQL Tuning 101 - Sep 2013
SQL Tuning 101 - Sep 2013Connor McDonald
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwarePratap Bikram Shahi
 
Production & operarions management review
Production & operarions management reviewProduction & operarions management review
Production & operarions management reviewRamon Fernandez, MBA
 
Production & Operarions Management Compre Review
Production & Operarions Management Compre ReviewProduction & Operarions Management Compre Review
Production & Operarions Management Compre ReviewRamon Fernandez, MBA
 
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptxAminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptxAminullah Assagaf
 
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...Peter Laurinec
 
Mq9 nsw 5 3 answers
Mq9 nsw 5 3 answersMq9 nsw 5 3 answers
Mq9 nsw 5 3 answersShubham Saha
 
Writing Sample
Writing SampleWriting Sample
Writing SampleYiqun Li
 
Design of experiment methodology
Design of experiment methodologyDesign of experiment methodology
Design of experiment methodologyCHUN-HAO KUNG
 
Roll grinding Six Sigma project
Roll grinding Six Sigma projectRoll grinding Six Sigma project
Roll grinding Six Sigma projectTariq Aziz
 
SSN Project Presentation March 2015
SSN Project Presentation March 2015SSN Project Presentation March 2015
SSN Project Presentation March 2015Ajay Nagvekar
 
Applied Econometrics assignment3
Applied Econometrics assignment3Applied Econometrics assignment3
Applied Econometrics assignment3Chenguang Li
 

Ähnlich wie Push And Pull Production Systems Chap7 Ppt) (20)

Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
Pushandpullproductionsystems chap7-ppt-100210005527-phpapp01[1]
 
Control charts
Control chartsControl charts
Control charts
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Forecasting Assignment Help
Forecasting Assignment HelpForecasting Assignment Help
Forecasting Assignment Help
 
Algebra and Trigonometry 9th Edition Larson Solutions Manual
Algebra and Trigonometry 9th Edition Larson Solutions ManualAlgebra and Trigonometry 9th Edition Larson Solutions Manual
Algebra and Trigonometry 9th Edition Larson Solutions Manual
 
Arna Friend Controls II Final
Arna Friend Controls II FinalArna Friend Controls II Final
Arna Friend Controls II Final
 
SQL Tuning 101 - Sep 2013
SQL Tuning 101 - Sep 2013SQL Tuning 101 - Sep 2013
SQL Tuning 101 - Sep 2013
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
Production & operarions management review
Production & operarions management reviewProduction & operarions management review
Production & operarions management review
 
Production & Operarions Management Compre Review
Production & Operarions Management Compre ReviewProduction & Operarions Management Compre Review
Production & Operarions Management Compre Review
 
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptxAminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
Aminullah Assagaf_P14-Ch.17_Scheduling-32.pptx
 
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
New Clustering-based Forecasting Method for Disaggregated End-consumer Electr...
 
Mq9 nsw 5 3 answers
Mq9 nsw 5 3 answersMq9 nsw 5 3 answers
Mq9 nsw 5 3 answers
 
Writing Sample
Writing SampleWriting Sample
Writing Sample
 
Design of experiment methodology
Design of experiment methodologyDesign of experiment methodology
Design of experiment methodology
 
Roll grinding Six Sigma project
Roll grinding Six Sigma projectRoll grinding Six Sigma project
Roll grinding Six Sigma project
 
SSN Project Presentation March 2015
SSN Project Presentation March 2015SSN Project Presentation March 2015
SSN Project Presentation March 2015
 
Project final control
Project final controlProject final control
Project final control
 
Assignment 101
Assignment 101Assignment 101
Assignment 101
 
Applied Econometrics assignment3
Applied Econometrics assignment3Applied Econometrics assignment3
Applied Econometrics assignment3
 

Mehr von 3abooodi

Winters Method
Winters MethodWinters Method
Winters Method3abooodi
 
Value Of Information
Value Of InformationValue Of Information
Value Of Information3abooodi
 
Trend Based + Reg And Holtns
Trend Based + Reg And HoltnsTrend Based + Reg And Holtns
Trend Based + Reg And Holtns3abooodi
 
Supply Chain Integration
Supply Chain IntegrationSupply Chain Integration
Supply Chain Integration3abooodi
 
Single Facility Lot Size Model Elsp
Single Facility Lot Size Model   ElspSingle Facility Lot Size Model   Elsp
Single Facility Lot Size Model Elsp3abooodi
 
Set Covering
Set CoveringSet Covering
Set Covering3abooodi
 
Multi Echelon Inventories
Multi Echelon InventoriesMulti Echelon Inventories
Multi Echelon Inventories3abooodi
 
Delayed Differantiation
Delayed DifferantiationDelayed Differantiation
Delayed Differantiation3abooodi
 
Maximum Covering
Maximum CoveringMaximum Covering
Maximum Covering3abooodi
 
Introduction To Scm
Introduction To ScmIntroduction To Scm
Introduction To Scm3abooodi
 
Delayed Product Differentiation
Delayed Product DifferentiationDelayed Product Differentiation
Delayed Product Differentiation3abooodi
 
Forecasting
ForecastingForecasting
Forecasting3abooodi
 
Inventory Control
Inventory ControlInventory Control
Inventory Control3abooodi
 
Continuous Review Inventory System
Continuous Review Inventory SystemContinuous Review Inventory System
Continuous Review Inventory System3abooodi
 
An Integrated Location Inventory Model
An Integrated Location Inventory ModelAn Integrated Location Inventory Model
An Integrated Location Inventory Model3abooodi
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning3abooodi
 
Role Of Robots
Role Of RobotsRole Of Robots
Role Of Robots3abooodi
 

Mehr von 3abooodi (20)

Winters Method
Winters MethodWinters Method
Winters Method
 
Vrp
VrpVrp
Vrp
 
Value Of Information
Value Of InformationValue Of Information
Value Of Information
 
Trend Based + Reg And Holtns
Trend Based + Reg And HoltnsTrend Based + Reg And Holtns
Trend Based + Reg And Holtns
 
Supply Chain Integration
Supply Chain IntegrationSupply Chain Integration
Supply Chain Integration
 
Single Facility Lot Size Model Elsp
Single Facility Lot Size Model   ElspSingle Facility Lot Size Model   Elsp
Single Facility Lot Size Model Elsp
 
Set Covering
Set CoveringSet Covering
Set Covering
 
Newsboy
NewsboyNewsboy
Newsboy
 
Multi Echelon Inventories
Multi Echelon InventoriesMulti Echelon Inventories
Multi Echelon Inventories
 
Delayed Differantiation
Delayed DifferantiationDelayed Differantiation
Delayed Differantiation
 
Maximum Covering
Maximum CoveringMaximum Covering
Maximum Covering
 
Introduction To Scm
Introduction To ScmIntroduction To Scm
Introduction To Scm
 
Delayed Product Differentiation
Delayed Product DifferentiationDelayed Product Differentiation
Delayed Product Differentiation
 
Forecasting
ForecastingForecasting
Forecasting
 
Inventory Control
Inventory ControlInventory Control
Inventory Control
 
Continuous Review Inventory System
Continuous Review Inventory SystemContinuous Review Inventory System
Continuous Review Inventory System
 
An Integrated Location Inventory Model
An Integrated Location Inventory ModelAn Integrated Location Inventory Model
An Integrated Location Inventory Model
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
 
Vmi1
Vmi1Vmi1
Vmi1
 
Role Of Robots
Role Of RobotsRole Of Robots
Role Of Robots
 

Kürzlich hochgeladen

Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 

Kürzlich hochgeladen (20)

Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 

Push And Pull Production Systems Chap7 Ppt)

  • 1. Chapter 7 Push and Pull Production Control Systems MRP and JIT
  • 2.
  • 3.
  • 4.
  • 5. Schematic of the Productive System Fig. 7-1
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. The Three Major Control Phases of the Productive System Fig. 7-2
  • 11.
  • 12. Typical Product Structure Diagram Fig. 7-3
  • 14. Product Structure Diagram for Harmon Trumpet Fig. 7-5
  • 15.
  • 16. 38 76 14 45 112 26 12 32 42 42 Net demand Expect 23 in inventory at the end of week 7 9 6 12 Scheduled Receipts Returns 38 76 14 45 112 26 21 38 42 77 Demand 17 16 15 14 13 12 11 10 9 8 Week
  • 17. MRP calculations for Bell assembly 38 76 14 45 112 26 12 32 42 42 Planned order release (lot for lot) 38 76 14 45 112 26 12 32 42 42 Time-phased Net Reqts 38 76 14 45 112 26 12 32 42 42 Lead time Net Reqts 38 76 14 45 112 26 12 32 42 42 Gross Reqts 17 16 15 14 13 12 11 10 9 8 7 6 Week
  • 18. MRP calculations for the valves 30 60 186 On-hand Inv. 96 Scheduled Receipts 114 228 42 135 336 78 36 66 Planned order release (lot for lot) 114 228 42 135 336 78 36 66 Time-phased Net Reqts 114 228 42 135 336 78 36 66 0 0 Net Reqts 114 228 42 135 336 78 36 96 126 126 Gross Reqts 13 12 11 10 9 8 7 6 5 4 3 2 Week
  • 19.
  • 20. Starting in week 4 C(1)=132 C(2)=[132+0.6(42)]/2=78.6 C(3)=[132+0.6(42+2(32))]/3=65.2 C(4)=[132+0.6(42+2(32)+3(12))]/4=54.3 C(5)=[132+0.6(42+2(32)+3(12)+4(26))]/5=55.92  y 4 = 42+42+32+12=128 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts . 13 12 11 10 9 8 7 6 5 4 Week
  • 21. Starting in week 8: C(1)=132 C(2)=[132+0.6(112)]/2=99.6 C(3)=[112+0.6(112+2(45))]/3=84.4 C(4)=[112+0.6(112+2(45)+3(14))]/4=69.6 C(5)=[112+0.6(112+2(45)+3(14)+4(76))]/5=92.16  y 8 = 26+112+45+14=197 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts. 13 12 11 10 9 8 7 6 5 4 Week
  • 22. Starting in week 12: C(1)=132 C(2)=[132+0.6(38)]/2=77.4  y 12 = 76+38=114 Week 4 5 6 7 8 9 10 11 12 13 Pon 128 0 0 0 197 0 0 0 114 0 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts. 13 12 11 10 9 8 7 6 5 4 Week
  • 23.
  • 24. Order horizon total holding cost 1 0 2 0.6(42)=25.2 3 0.6(42+2(32))=64.8 4 0.6(42+2(32)+3(12))=86.4 5 0.6(42+2(32)+3(12)+4(26))=148.8 > 132 Since 148.8 is closer to 132 than 86.4 the order horizon is 5 periods _________________________________________________________ 1 0 2 0.6(45)=27=27 3 0.6(45+2(14))=43.8 4 0.6(45+2(14)+3(76))=180.6 > 132 Since 121.2 is closer to 132 than 151.2 the order horizon is 3 periods _________________________________________________________ 38 76 14 45 112 26 12 32 42 42 Time-phased net reqts . 13 12 11 10 9 8 7 6 5 4 Week
  • 25. MRP calculations for valve casing Inv Del Ord Net Reqt 0 38 0 14 59 171 0 12 44 86 128 42 4 12 0 114 0 0 0 197 0 0 0 128 0 114 0 0 0 197 0 0 0 38 76 14 45 112 26 32 42 38 76 14 45 112 26 12 32 42 42 17 16 15 14 13 12 11 10 9 8 7 6 5
  • 26.
  • 27. Lower level of valve casing (valves) SM Orders 198 0 0 0 495 0 0 0 342 0 0 0 0 Time-Phased Net Reqts OH inv Receipts Gross Rqts. 0 0 0 0 342 0 0 0 495 0 0 0 198 1 0 342 0 0 0 495 0 0 0 198 0 96 96 96 0 186 96 0 342 0 0 0 591 0 0 0 384 13 12 11 10 9 8 7 6 5 4 3 2
  • 28.
  • 29.
  • 30.
  • 31. Calculations of the improvement step 0 0 0 0 272 295 0 91 20 Excess capacity 242 192 30 50 120 50 28 105 200 109 100 y 0 0 58 108 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
  • 32. Calculations continued 0 0 0 0 192 295 0 91 20 Excess capacity 142 0 0 120 50 108 105 200 109 100 y 0 158 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
  • 33. 0 0 0 0 142 295 0 91 20 Excess capacity 300 137 0 0 120 0 158 105 200 109 100 y 0 263 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
  • 34. 0 0 0 0 300 137 0 91 20 Excess capacity 0 0 120 0 0 263 200 109 100 y 30 50 120 50 300 400 200 200 120 c 30 50 120 50 28 105 200 109 100 r’ 9 8 7 6 5 4 3 2 1 Period
  • 35.